{"id":173,"date":"2026-02-24T02:02:19","date_gmt":"2026-02-24T02:02:19","guid":{"rendered":"https:\/\/gen-tes.com.tr\/en\/?p=173"},"modified":"2026-02-24T02:02:22","modified_gmt":"2026-02-24T02:02:22","slug":"istanbul-kaplancali-business-center","status":"publish","type":"post","link":"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kaplancali-business-center\/","title":{"rendered":"Istanbul Kaplancali Business Center"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"584\" height=\"706\" src=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-13.png\" alt=\"\" class=\"wp-image-174\" srcset=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-13.png 584w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-13-248x300.png 248w\" sizes=\"auto, (max-width: 584px) 100vw, 584px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p><strong>Constr. Area <\/strong>4.500 sq.m.<br><strong>Client<\/strong> KLIMA Co.Inc.(Owner)<br><strong>Services<\/strong> Mechanical Engineering design, preparation of BOQ&#8217;s, Tech. Specs. (Complete design: ODTM)<br><strong>Scope of Design<\/strong><br>Heating, ventilation, air conditioning hot-cold domestic water, waste water, storm water, fire extinguishing, central heating\/cooling plants, automatic controls<br><strong>Design Phases<\/strong><br>Concept design, final design, tech.<br>details<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Constr. Area 4.500 sq.m.Client KLIMA Co.Inc.(Owner)Services Mechanical Engineering design, preparation of BOQ&#8217;s, Tech. Specs. (Complete design: ODTM)Scope of DesignHeating, ventilation, air conditioning hot-cold domestic water, waste water, storm water, fire extinguishing, central heating\/cooling plants, automatic controlsDesign PhasesConcept design, final design, tech.details<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-173","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"featured_image_src":null,"author_info":{"display_name":"ycolasan","author_link":"https:\/\/gen-tes.com.tr\/en\/reference\/author\/ycolasan\/"},"_links":{"self":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/comments?post=173"}],"version-history":[{"count":1,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/173\/revisions"}],"predecessor-version":[{"id":175,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/173\/revisions\/175"}],"wp:attachment":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/media?parent=173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/categories?post=173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/tags?post=173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}