{"id":170,"date":"2026-02-24T01:59:52","date_gmt":"2026-02-24T01:59:52","guid":{"rendered":"https:\/\/gen-tes.com.tr\/en\/?p=170"},"modified":"2026-02-24T01:59:54","modified_gmt":"2026-02-24T01:59:54","slug":"antalya-kemer-rutotel","status":"publish","type":"post","link":"https:\/\/gen-tes.com.tr\/en\/reference\/antalya-kemer-rutotel\/","title":{"rendered":"Antalya Kemer RUTOTEL"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"443\" src=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-12-1024x443.png\" alt=\"\" class=\"wp-image-171\" srcset=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-12-1024x443.png 1024w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-12-300x130.png 300w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-12-768x332.png 768w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-12.png 1098w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>Constr. Area<\/strong> 10.000 sq.m.<br><strong>No.of Beds<\/strong> 312<br><strong>Client<\/strong> RUTO Co.Inc. (Owner)<br><strong>Services<\/strong> <br>Mechanical Engineering design, preparation of BOQ&#8217;s, tech. specs.<br><strong>Scope of Design<\/strong> <br>Heating, ventilation, air conditioning, hot-cold domestic water, waste water, storm water, fire extinguishing, kitchen, laundry, LPG, cold storages, central heating\/cooling plants, automatic controls<br><strong>Design Phases<\/strong> <br>Concept design, preliminary design, final design, tech. details<br>Notes The 5-star hotel has got Guest Rooms, Restaurants, Meeting rooms, Multi-Purpose Hall, Lobby, Bar,<br>Foyers, Admin. and Mechanical areas.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Constr. Area 10.000 sq.m.No.of Beds 312Client RUTO Co.Inc. (Owner)Services Mechanical Engineering design, preparation of BOQ&#8217;s, tech. specs.Scope of Design Heating, ventilation, air conditioning, hot-cold domestic water, waste water, storm water, fire extinguishing, kitchen, laundry, LPG, cold storages, central heating\/cooling plants, automatic controlsDesign Phases Concept design, preliminary design, final design, tech. detailsNotes The 5-star hotel has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-170","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"featured_image_src":null,"author_info":{"display_name":"ycolasan","author_link":"https:\/\/gen-tes.com.tr\/en\/reference\/author\/ycolasan\/"},"_links":{"self":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/comments?post=170"}],"version-history":[{"count":1,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/170\/revisions"}],"predecessor-version":[{"id":172,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/posts\/170\/revisions\/172"}],"wp:attachment":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/media?parent=170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/categories?post=170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/tags?post=170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}