{"id":73,"date":"2026-02-23T14:25:26","date_gmt":"2026-02-23T14:25:26","guid":{"rendered":"https:\/\/gen-tes.com.tr\/en\/?page_id=73"},"modified":"2026-03-19T16:09:22","modified_gmt":"2026-03-19T16:09:22","slug":"references_en","status":"publish","type":"page","link":"https:\/\/gen-tes.com.tr\/en\/references_en\/","title":{"rendered":"References"},"content":{"rendered":"<div class=\"wp-block-ub-content-toggle wp-block-ub-content-toggle-block\" id=\"ub-content-toggle-block-71a52fa8-7dbe-4306-9e88-b72e020882d7\" data-mobilecollapse=\"false\" data-desktopcollapse=\"false\" data-preventcollapse=\"false\" data-showonlyone=\"true\">\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-0-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>SELECTED REFERENCES (1978-2025)<br><\/strong>(Mechanical Engineering design services unless otherwise stated. Please also see categorized references below.)<\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-0-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>Ankara ANITKABIR (Ataturk&#8217;s Mousoleum) Heating &amp;\u00a0Ventilation System<\/strong> <strong>Design<\/strong>\u00a0(Turkish Armed Forces Gen. Staff Headquarters &amp; Contractor Haydar Sanli)<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"417\" src=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir-1024x417.jpg\" alt=\"\" class=\"wp-image-86\" srcset=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir-1024x417.jpg 1024w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir-300x122.jpg 300w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir-768x313.jpg 768w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir.jpg 1231w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><strong>\u201cMERKEZ ANKARA\u201d Mix Use Complex <\/strong>(Pasifik GYO)GEN-TES provided Mechanical Engineering\u00a0 Design Consultancy Services<br>(HVAC, Sanitary and Fire Fighting designs) during the Concept and Preliminary Design phases of the Complex.<br> <strong>Features:<br><\/strong>&#8211; Residential, office, retail, and other functions on a single large parcel of 125.000 sq.m. Total construction area: 1,185,015 sq.m.<br>&#8211; Residential components, with 1578 units divided into different types and blocks, each with variations in apartment sizes.<br>&#8211; Commercial\/Office towers with parking and open spaces. Pasific Tower (Flagship Skyscraper, 66 floors, 300 m. high), Collective Office Tower and Terrace Office Tower &#8211; serving as office complexes.<br>&#8211; Retail-Commercial Zone (a 600 m. long open-air shopping street\/retail avenue with about 150 shops in its retail corridor)<br>&#8211; Offices (total of varying between 1425-1500 offices)<br>&#8211; Residential and mix-use blocks\u00a0 (Residential Block: 38 floors)<br>&#8211; Smaller City Suites and Villas<br>&#8211; Various social facilities, landscaped open areas and plazas, shared courtyards, gardens and ponds.<br>(Construction of some buildings, such as apartment houses-villas, hotels and some shopping areas continue in the year\u00a02025)<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\">\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"372\" height=\"309\" src=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7.jpeg\" alt=\"\" class=\"wp-image-83\" srcset=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7.jpeg 372w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7-300x249.jpeg 300w\" sizes=\"auto, (max-width: 372px) 100vw, 372px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"332\" height=\"313\" src=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-6.jpeg\" alt=\"\" class=\"wp-image-82\" srcset=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-6.jpeg 332w, https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-6-300x283.jpeg 300w\" sizes=\"auto, (max-width: 332px) 100vw, 332px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AnkaraBuyuksehir\/AnkaraBuyuksehir.htm\"><strong>Ankara Metropolitan Municipality Palace<\/strong><\/a>,<strong>\u00a0<\/strong>85.000 sq.m.<br>(Ankara\u00a0Metropolitan Municipality\u00a0)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NovokuznetskHastane\/NovokuznetskHastane.htm\"><strong>NOVOKUZNETSK\/Siberia Surgical Hospital\u00a0<\/strong><\/a>,\u00a0500 beds, 41.000 sq.m.<br>(PETKONTUR Co. Inc. &amp; Zapsib Steel Factory, Russia)\u00a0<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia Polyclinics Bldg.<\/strong>, 8.500 sq.m.<br>(Petkontur Co. Inc.\u00a0 &amp; Zapsib Steel Factory, Russia)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia Zapsib\u00a0Steel Factory General Directorate Bldg.\u00a0<\/strong>Russia\u00a0((Petkontur Co. Inc.&amp; Zapsib Steel Factory)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia\u00a0<\/strong>\u00a0<strong>Bread Factory<br><\/strong>(Petkontur &amp;Zapsib Steel Factory, Russia)<br>\u00a0<strong>NOVOKUZNETSK\/Siberia\u00a0<\/strong>\u00a0<strong>Brewery<br><\/strong>(Petkontur &amp;Zapsib Steel Factory, Russia)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KhantyMansisky\/KhantyMansisky.htm\"><strong>KHANTY MANSISKY\u00a0 General Hospital -Siberia\/Russia<\/strong><\/a>, 500 beds, 41.000 sq.m. (Lukova Co. Inc.) (Multi-disciplinary design under mother company ODTM Co. Inc.) (Lukova Co. Inc.) <br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kogalym-maternity-hospital\/\" data-type=\"post\" data-id=\"123\">KOGALYM Maternity Hospital<\/a><\/strong> (Siberia\/Russia) 240 beds, 10,200 sq.m.<br>(multi-disciplinary design under mother company ODTM Co. Inc.) (Lukova Co. Inc.)<strong><br><br>BABUSHKIN Hospital Preliminary Mechanical Design<\/strong>, Russia\/Republic of Buryatya, 1000 beds, 100.000 sq.m.(MIR Co. Inc.)<strong><br><br>Yalova Psychotherapy &amp; Rehabilitation Hospital,\u00a0<\/strong>14.000 sq.m.<br>(Federation of Red Crescent &amp; Red Cross)\u00a0<br>(Mechanical &amp; Electrical Eng. Design and Tender Consultancy)\u00a0\u00a0\u00a0<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AnkaraHilton\/AnkaraHilton.htm\"><strong>Ankara HILTON Hotel<\/strong><\/a>, 5 stars,\u00a0700 beds, 33.000 sq.m. (Hilton International)<br><br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SheratonKongre\/SHERATON.htm\"><strong>ANKARA SHERATON\u00a0 Conference &amp; Culture Center and\u00a0&#8216;Luxury Collection&#8217; Hotel<\/strong><\/a> 35.000 sq.m. (Sheraton Intl. &amp; NUROL Co.Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AntalyaFalez\/AntalyaFalez.htm\"><strong>Antalya FALEZ International Hotel<\/strong><\/a>, 5 stars, 700 beds, 40.000 sq.m.\u00a0<br>(Steigenberger + OR-SA Re-design) <br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AdanaGalleria\/galleria_web.htm\"><strong>Adana GALLERIA Shopping Center<\/strong><\/a>, 80.000 sq.m. (Anakent +SUMMA)<br><br><strong>Complete Consultancy for 57 Elementary Schools in 22 Provinces of Turkiye<br><\/strong>(Design and construction supervision services under mother company ODTM)(Ministry of Education)\u00a0<br><br><strong>Niger Air Base 201 Compound Near Agades, <\/strong>total\u00a0\u00a0 area of 25 sq. kilometers (25,000,000 sq.m.) (Also called \u2018USAF Compound\u2019) (USAF &amp; GEMAS Co. Inc.)<br>&#8211; Aircraft Support Facilities<br>&#8211; Base Camp and Support Buildings<br>&#8211; Living Quarters and Personnel Facilities<br>&#8211; Base Roads and Utilities<br>&#8211; Perimeter Fence and Guard Towers<br>&#8211; Fuel Storage and Maintenance Areas<br>&#8211; Life Support and Logistical Facilities<br>&#8211; Training and Operations Buildings<br>&#8211; Aircraft Hangars &#8211; Barracks<\/p>\n\n\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound<br>&#8211; <\/strong>Workers&#8217; Houses, 850 ea.<br>&#8211; Turkish Bath, 630 sq.m.\u00a0<br>&#8211; Sports Hall (closed), 3.300 sq.m. \u00a0<br>&#8211; Cinema, 1.130 sq.m.<br>&#8211; Shopping Center, 1.200 sq.m.<br>&#8211; First Aid Bldg., 900 sq.m.<br>&#8211; Workers&#8217; Dormitory, 10.400 sq.m.<br>&#8211; Technical High School, 13.600 sq.m.<br>&#8211; High School, 1.600 sq.m.<br>&#8211; Elementary School, 1.600 sq.m.<br>&#8211; Nursing School, 960 sq.m.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Three\u00a0 Squadron Operations + Wing Operations and Three Squadron Operations Buildings <\/strong>with CBR shelters\u00a0at different provinces of Turkiye(NATO + USAF)<br>(CBR = Military shelters protected against chemical, biological and nuclear attacks )<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kadikoy-governmental-complex\/\" data-type=\"post\" data-id=\"131\">Istanbul Kadikoy Governmental Complex<\/a> ,<\/strong> 43.000 sq.m. (Ministry of Public Works)<\/p>\n\n\n\n<p><strong>State Naval\u00a0Forces of Turkiye <\/strong>(Ministry of Defense)<br>&#8211; Izmir Foca Shooting Polygon, 3.000 sq.m.\u00a0<br>&#8211; Zonguldak\/Eregli Military Guest House, 2.500 sq.m.<br>&#8211; Istanbul Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Izmir Foca Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.<br>&#8211; Izmir Underwater Duty Group Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Ankara Elmadag Barracks, 500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound &#8211; Kitchen &amp; Cafeteria, 1.300 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound- Nursing House, 1.500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound &#8211; Central Heating Plant\u00a0<br>&#8211; Izmir Yolluca Island Lodgings,Central Heating Plant\u00a0and Exterior Heating Network<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/q-west-iraq-theater-transportation-mission-area-buildings\/\" data-type=\"post\" data-id=\"134\">Q-West\/IRAQ Theater Transportation Mission Area Buildings<\/a> <\/strong>(US Army Corps of Engineers) (Design-Build project, design undertaken by GEN-TES)\u00a0<br><br><strong>METU (Middle East Technical University) Gaziantep Campus\u00a0Electrical &#8211; Electronics Engineering Laboratories Bldg.,<\/strong>\u00a01.100 sq.m.\u00a0<br><br><strong>Norwaste Waste-to-Energy Plants\u00a0(<\/strong>Technical Consultancy and Representation (Norwaste\/Norway) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SelcukUniversitesi\/SelcukUniversitesi.htm\"><strong>Konya SELCUK UNIVERSITY\u00a0<\/strong><\/a>(Total : 200.000 sq.m.)<\/p>\n\n\n\n<p>&#8211; Faculty of Science, 60.000 sq.m.\u00a0<br>&#8211; Faculty of Literature, 25.000 sq.m.\u00a0<br>&#8211; Presidential Bldg.\u00a0<br>&#8211; Medico-Social Center\u00a0<br>&#8211; Computer Center\u00a0<br>&#8211; Printing House\u00a0<br>&#8211; Library Bldg.\u00a0<br>&#8211; Cafeteria Bldg.\u00a0<br>&#8211; Guest House<\/p>\n\n\n\n<p><strong>Konya SELCUK UNIVERSITY,\u00a0 Faculty of Medical Sciences\u00a0&amp; Hospital<\/strong><br>90.000 sq.m.\u00a0<br><br><strong>Konya ILGIN Power Plant &amp; Coal Mines Admin. &amp; Technical\u00a0\u00a0 Bldg.&#8217;s Complex<br><\/strong>12.000 sq.m. (Konya Ilgin Electric Production B.V.\u00a0\u2013 USA)\u00a0\u00a0<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/aibu-duzce-konuralp-research-educational-hospital\/\" data-type=\"post\" data-id=\"136\">AIBU Duzce Konuralp Research &amp; Educational Hospital<\/a>, <\/strong>3.000 sq.m.<br>(Abant Izzet Baysal University)<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan USAF Compound<\/strong> (USAF &#8211; GEMAS Co. Inc.)\u00a0<br>&#8211; ACCOM &amp; CIS Buildings<br>&#8211; Warehouses 1-2-3-4<br>&#8211; Admin Building<br>&#8211; Guard House<br>&#8211; Pump House<br>&#8211; H-Diesel Generator<br>&#8211; MDP-synpanel &amp; fuel tank<\/p>\n\n\n\n<p><strong>Adana-Incirlik\u00a0NATO\u00a0Air Base Security Battalion Commandership Bldg.<br><\/strong>4.000 sq.m.(NATO)<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan COMKAF HQ Office Accommodations <\/strong>(FEM JV-GEMAS) &#8211; Kilo Hangar East &amp; West Wings<br>&#8211; BOC Building Renovation<br>&#8211; New COMCAF HQ Building<br>&#8211; TLS Building Renovation<br>&#8211; Hangar<br>&#8211; Container Park<\/p>\n\n\n\n<p><strong>Istanbul SABIHA GOKCEN\u00a0 AIRPORT <\/strong>(1999 NATO Project,later civilian airport) <strong>\u00a0\u00a0<br><\/strong>(total of 37.460 sq.m.- 1999)<br>&#8211; Domestic Flights Terminal Bldg., 4.000 sq.m.<br>&#8211; Cargo Bldg., 6.000 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Security Bldg., 1.800 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Guest House, 1.500 sq.m.\u00a0\u00a0<br>&#8211; Police Security Bldg., 4.700 sq.m.<br>&#8211; Vehicle Maintenance Workshop, 4.000 sq.m.\u00a0\u00a0<br>&#8211; Private Companies&#8217; Services Bldg., 4.760 sq.m.\u00a0\u00a0<br>&#8211; Customs Bldg., 1.650 sq.m.\u00a0\u00a0<br>&#8211; Accident-Fire, Fire Brigade Bldg., 4.050 sq.m.\u00a0\u00a0<br>&#8211; Lodgings, 50 houses<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base &#8211; Trailer-Truck Aircraft Facility <\/strong>(NATO)<br>&#8211; Electronics Workshop &amp; Field Support Workshop Bldgs.<br>&#8211; Maintenance Commandership Headquarters<br>&#8211; BEM\/GBE Commandership Bldg.<br>&#8211; Parachute Center<br>&#8211; Chargery<br>&#8211; Production Workshop Line<br>&#8211; Maintenance Bldg.<br>&#8211; Supply Storage Bldg.<br>&#8211; Central Heating Plant &amp; Exterior Heating Network<\/p>\n\n\n\n<p><strong>Protection and Sustainable Development of Natural Resources and Biodiversity in Kirklareli Yildiz Mountains of Turkiye <\/strong>(UNESCO)<\/p>\n\n\n\n<p><strong>NEBITCI Hotel &#8211; Nebitdag \/ Turkmenistan,\u00a0<\/strong>7.000 sq.m. (Private client)<br>( Design Consultancy Services)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AAFESPX\/AAFES_PX_web.htm\"><strong>Adana\/Incirlik NATO Air Base AAFES PX (BX) Shopping Center<\/strong><\/a><\/p>\n\n\n\n<p><strong>A<a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\">dana Incirlik Air Base Family Eagle Housing<\/a><\/strong>\u00a0, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<\/p>\n\n\n\n<p><strong>Renovation of Ankara Balgat Sports Hall <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Renovation of Adana Incirlik Sports Hall <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Family Services Center <\/strong>&#8211; Turkiye (USAF)<\/p>\n\n\n\n<p><strong>Adana Incirlik Air Base Mix Use Facility <\/strong>(NATO) <strong><br>&#8211; <\/strong>Security Police Operations Bldg.<br>&#8211; Fuels Laboratory<br>&#8211; New Gymnasium<br>&#8211; Radar Transmitter Building<br>&#8211; Medical Warehouse<br>&#8211; Field Support buildings (NATO)<\/p>\n\n\n\n<p><strong>Diyarbakir\/ Pirinclik Radar Base Security Bldg.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Renovation of Adana Incirlik Library Building <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base Avionics Facility<\/strong> (NATO + USAF)<\/p>\n\n\n\n<p><strong>Ankara Murted Air Base &#8211; Protected Avionics Workshop for F1-16s.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline\u00a0 Station\u00a0<\/strong>\u00a0\u00a0<br>(AAFES, Zirndorf &#8211; GERMANY\u00a0<a id=\"_msocom_1\"><\/a><\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kaia-north-relocation-kabul-afghanistan-facilities\/\" data-type=\"post\" data-id=\"139\">Kaia North Relocation Kabul\/Afghanistan Facilities<\/a> <\/strong>(NAMSA-NATO Europe<br>&#8211; HQ Main and AOC\/Force Protection\/AIS-FSO Bldg.<br>&#8211; Passenger Terminal (PRC)<br>&#8211; Cargo Office and Cargo Tents<br>&#8211; Helicopter Hangar<br>&#8211; CIS Building<br>&#8211; Workshop\/Supply Building<br>&#8211; Camp Facilities Maintenance Building<br>&#8211; Dog Kennel<br>&#8211; Fuel Station and Car Wash<br>&#8211; Solid Garbage Treatment Plant<br>&#8211; Accommodations Buildings Type A, B and C<br>&#8211; MWA\/Gymnasium<br>&#8211; Laundry Building<br>&#8211; Dining Hall and Main Kitchen<br><strong>&#8211; <\/strong>Meteorology Building- Follow-me Building<br>&#8211; SNIC Building<\/p>\n\n\n\n<p><strong>Kirsehir CEMAS\u00a0 Steel &amp; Steel Products Factory &#8211; Laboratories Bldg. and Cooling Water Facility\u00a0<\/strong>(Private client)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/sanliurfa-gap-airport-terminal\/\" data-type=\"post\" data-id=\"141\">Sanliurfa GAP Airport Terminal<\/a><\/strong>, 3.500 sq.m., (Under ODTM) (GAP &amp; DLH)<br><br><strong>Ankara MACUNKOY Bread Factories\u00a0(2) <\/strong>6.000 sq.m.+1.650sq.m.\u00a0<br>(Ankara Municipality)<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-etimesgut-military-hospital-renovation\/\" data-type=\"post\" data-id=\"144\">Ankara Etimesgut Military Hospital Renovation of Operation Theaters and Intensive Care Unit<\/a> (<\/strong>Etimesgut Military Hospital)\u00a0<br><br><strong>Aydin\/Cine CAG-KOOP Meat Processing Facility<\/strong>, 5.000 sq.m\u00a0\u00a0<br>(Mech.Eng.preliminary design)\u00a0<br><br><strong>Istanbul\u00a0CAYKUR<\/strong>\u00a0<strong>Buyukdere Tea Packing Factory<\/strong>,11.500 sq.m.<br>(Ministry of Customs and Monopolies)<br><br><strong>Kayseri Wooden Works Industrial Compound and Brickett Drying Facility<\/strong>\u00a0(Private client)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KemerYatLimani\/KemerYatLimani.htm\"><strong>Antalya\/Kemer Marina\u00a0Facilities<\/strong><\/a><strong>,<\/strong>\u00a020.500 sq.m. (total) (State Tourism Bank) <\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-bayindir-hospital\/\" data-type=\"post\" data-id=\"147\">Ankara BAYINDIR Hospital<\/a><\/strong> 200 beds, 14.000 sq.m. (Bayindir Holding)<\/p>\n\n\n\n<p><strong>IZMIR Military Operations Building<\/strong> (NATO)\u00a0<\/p>\n\n\n\n<p><strong>MOSCOW New Police Center, <\/strong>Russia12.000 sq.m. (SIBTEK Co. Inc.)<\/p>\n\n\n\n<p><strong>MOSCOW Business Center &#8211; <\/strong>Russia, 11.000 sq.m. (Sibtek Co. Inc.)<\/p>\n\n\n\n<p><strong>ANAPA Mass Houses and Social Facilities, <\/strong>Russia (KLIMA Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/batman-guest-house-social-facilities\/\" data-type=\"post\" data-id=\"150\">Batman Guest House\u00a0 &amp; Social Facilities<\/a><\/strong>,\u00a0 3.500 sq.m. TPAO\u00a0 Gen. Directorate of Turkish Petrolium\u00a0\u00a0 Co. Inc.<\/p>\n\n\n\n<p><strong>Istanbul\/Umraniye CINEMAXX Cinema Halls Bldg.<\/strong> (Eight Halls)\u00a0<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/sevilla-expo-92-spain-world-fair\/\" data-type=\"post\" data-id=\"154\">Sevilla EXPO 92 Spain World Fair<\/a><\/strong>, Pavillion of Turkiye (Ministry of Culture)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-tek-cayirhan-mosque\/\" data-type=\"post\" data-id=\"159\">Ankara TEK Cayirhan Mosque<\/a><\/strong> (MNG Inc.) \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<br><br><strong>Mugla\/Marmaris AMAZON Camping Facilities and Swimming pool\u00a0\u00a0<br><\/strong>(Design + site supervision) <strong>(<\/strong>Private\u00a0client)<br><br><strong>TEK Ankara Golbasi Olympic Swimming Pool &amp; Sports Hall<\/strong>.<br>(State Electricity Institution)\u00a0<br><br><strong>Erzurum\/Kargapazari Air Defense Radar Facilities<\/strong> (NATO)<br><br><strong>Istanbul BAYRAMPASA Wholesale Market,\u00a0<\/strong>100.000 sq.m. (Istanbul Municipality)<\/p>\n\n\n\n<p><strong>Izmir 9 EYLUL University Hospital<\/strong>, 700 beds, 30,000 sq.m.\u00a0<br>(Heating through thermal water.) <strong><br><br><\/strong><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NationalBank\/NationalBank.htm\"><strong>UFA NATIONAL BANK &#8211; Bashkortostan-Russia<\/strong><\/a>, 5.600 sq.m.\u00a0(Klima Co. Inc.)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/MalatyaMerkezBank\/MalatyaMerkezBank.htm\"><strong>State National Bank Malatya Regional Headquarters and Staff Lodgings<\/strong><\/a>\u00a0<br>8.000 sq.m.\u00a0(State National Bank) <br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/BilkentOtel\/BilkentOtel.htm\"><strong>Ankara BILKENT\u00a0Conference Center, multi-Purpose Hall (1000 pax), Additional 5 Star Hotel\u00a0&amp; Renovation of Existing 4 Star Hotel<\/strong><\/a><strong>,\u00a0<\/strong>19.000 sq.m. (Bilintur Co. Inc.)<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-idil-general-directorate-bldg\/\" data-type=\"post\" data-id=\"162\">Ankara IDIL General Directorate Bldg.<\/a><\/strong> 1.500 sq.m. (IDIL Co. Inc.) \u00a0<\/p>\n\n\n\n<p><strong>Ankara and Izmir International Airport Terminals Arch. &amp; Eng.<\/strong> <strong>Design Competition <\/strong>(Mech. Concept Design &amp; Report, 2nd award for Ankara International Airport ) (Under mother company ODTM)<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/diyarbakir-underground-shopping-mall\/\" data-type=\"post\" data-id=\"165\">Diyarbakir Underground Shopping Mall<\/a>, <\/strong>100 shops (Diyarbakir Municipality)<br><br><strong>Ankara Grand National Assembly\u00a0&#8211; Staff Lodging Buildings<br><\/strong>220 apartment houses (design &amp; site supervision)\u00a0<br>(TC Grand National Assembly)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/UME\/ume.htm\"><strong>TUBITAK Gebze Campus\u00a0UME New Metrology Laboratories Complex<\/strong><\/a>,24.400 sq.m.\u00a0 (UME National Metrology Institute, Turkiye)\u00a0<strong>(<\/strong>Hyperlink provided<strong>)<\/strong><br><br><strong>State Electricity Institution Buildings (TEK)<br><\/strong>&#8211; Kahramanmaras Management Center<br>&#8211; Kahramanmaras Cafeteria, Guest House and Admin. Bldg.<br>&#8211; Yenikoy Power Plant Recreational Bldg.<br><br><strong>SSK Ankara Diskapi Hospital Additional Bldg.<\/strong>\u00a0300 beds<br>(State Social Security Inst.)\u00a0 \u00a0<br><br><strong>Ankara\/Kecioren Revolving Tower &amp; Restaurant<\/strong>, 1.500 sq.m.(Kecioren Municipality)<br><br><strong>Diyarbakir Kralkizi Dam<\/strong>\u00a0(<strong>DSI<\/strong> <strong>State Hydraulic Works Inst.)<\/strong><br>&#8211; Heating Plant &amp; Exterior Heating Network of the Compound\u00a0<br>&#8211; Recreational\u00a0Bldg.<br><br><strong>Ankara Murted NATO Air Base Avionics Workshop <\/strong>(NATO)<strong><br><br>Ankara Murted Air Base &#8211; Protected Avionics Workshop for F1-16s.<\/strong> (NATO)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/LutfiKirdar\/LutfiKirdarWeb.htm\"><strong>Istanbul LUTFI KIRDAR International Conference Center, Additional\u00a0<br>multi- Purpose\u00a0(2000 pax) and Exhibition (2000 pax) Halls Bldg.<\/strong><\/a>13.750 sq.m.(UKTAS Co.Inc.)<br><br><strong>AIBU Abant Izzet Baysal Univ Bolu Campus,\u00a0Faculty of\u00a0Electrics &amp; Electronics Engineering Buildings,<\/strong> 10.500\u00a0sq.m.(Abant Izzet Baysal University)<br><br><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline\u00a0 Station\u00a0<\/strong>\u00a0\u00a0<br>(AAFES, Zirndorf &#8211; GERMANY\u00a0<br><br><strong>Adana\/Incirlik AAFES Air Base Electronics Sales Shop<\/strong> (USAF)<br><br><strong>Gunal\u00a0Co.Inc.\u00a0MNG Ankara Industrial Compound <\/strong>(MNG Holding)<br>&#8211; Wooden Workshop<br>&#8211; Steel Workshop<br>&#8211; Admin. Bldg.<br>&#8211; Central Heating Plant<br><br><strong>Konya ILGIN Electric Production Facilities<\/strong> (B.V. USA)<br><br><strong>Ankara 300 Business Units (<\/strong>Ankara Commerce Stock Exchange)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<br>(Complete Consultancy)\u00a0\u00a0<br><br><strong>Ankara\/GOLBASI\u00a0Health Care Center<\/strong>,\u00a02.000 sq.m.\u00a0<br>(TEK State Electricity\u00a0 Inst.)<br><br><strong>Balikesir Air Base Fuel Distribution Facility\u00a0<\/strong>(NATO +\u00a0USAF)<\/p>\n\n\n\n<p><strong>Ankara 16th JET Air Base\u00a0Aircraft Maintenance Hangar\u00a0<\/strong>(Ministry of Defense) <\/p>\n\n\n\n<p><strong>WESTINGHOUSE Ankara Electronics Factory<\/strong> (Preliminary Mechanical\u00a0 Design (WESSA)<br><br><strong>Diyarbakir\/Pirinclik NATO Radar Base\u00a0Security\u00a0Bldg. <\/strong>(\u00a0USAF)<br><br><strong>Balikesir NATO Air Base\u00a0Maintenance Workshops <\/strong>(USAF) <\/p>\n\n\n\n<p><strong>Mugla\/Koycegiz Iztuzu Kucukgol Hotel<\/strong>, 16.600 sq.m (State Tourism Bank)<\/p>\n\n\n\n<p><strong>Mugla\/Koycegiz Iztuzu Lake Recreational Facilities (<\/strong>State Tourism Bank)<br><br><strong>Karabuk SSK Hospital-Additional Dining Hall and Doctors&#8217; Lodgings\u00a0<br><\/strong>2.100 sq.m. (State Social Security Inst.)\u00a0<\/p>\n\n\n\n<p><strong>Canakkale\u00a0CON-TUR Touristic Facilities<\/strong>, 15.000 sq.m. (Private client)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/TEKLokal\/Lokal.htm\"><strong>TEK Ankara Golbasi Recreational Bldg.<\/strong><\/a> <strong>&amp; Social Facility<\/strong> 4.500 sq.m. (State Electricity Inst.)<br><br><strong>Three Social Facilities in Adana, Balikesir and\u00a0Ankara\/Elmadag for Air\/Radar Bases <\/strong>(NATO +USAF)<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum OZLEM Touristic Facilities <\/strong>(Private client)<strong><br>&#8211; <\/strong>Guest Rooms Building\u00a0\u00a0<br>&#8211; Swimming Pool\u00a0<br>&#8211; Restaurant\u00a0Building<\/p>\n\n\n\n<p><strong>Adana City, Potable Water Institution Admin. Buildings<br><\/strong>(DSI State Hydraulic Works Inst.)<br><br><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia OK(Preliminary Mechanical Design)80.000 sq.m.(MIR)\u00a0<\/p>\n\n\n\n<p><strong>MESA Ankara General Directorate Bldg.<\/strong>, 6.500 sq.m. (Mesa Co.Inc.)<br><br><strong>Adana Incirlik NATO Air Base Guest House\u00a0(<\/strong>USAF BCE)\u00a0 <strong><br><br>Ankara Murted NATO Air Base Guest House\u00a0\u00a0<\/strong>(NATO) <strong><br><br>SMOLENSKAYA Housing &amp; Business Center &#8211; <\/strong>Moscow\/Russia<br>(Sibtek\u00a0Co. Inc.)\u00a0\u00a0\u00a0<br><br><strong>Ankara Elmadag Radar Facilities <\/strong>(NATO)<br><br><strong>Ankara AKBANK Regional Headquarters Bldg.\u00a0<\/strong> 6.500 sq.m.<br>(AKBANK Gen. Directorate)\u00a0<br><br><strong>Ankara MTA Staff Housing Cooperative Houses<\/strong>, 256 houses (MTA Koop.)<br><br><strong>AAFES Adana-Incirlik NATO Air Base Electronics Sales Shop<br><\/strong>(AAFES, Zirndorf \/ Germany)\u00a0 \u00a0\u00a0<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBUDuzceTip\/TipMorfoloji.htm\"><strong>AIBU Duzce Campus Faculty of Medicine<\/strong><\/a> , total of 33.000 sq.m. (Abant Izzet Baysal University)\u00a0<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBURektorluk\/AUBIRektorluk.htm\"><strong>AIBU Bolu Campus Presidential Bldg.<\/strong><\/a><strong>\u00a0<\/strong>7.800 sq.m. (Abant Izzet Baysal University)\u00a0\u00a0<br><br><strong>Antalya\/<\/strong><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/FavoriOtel\/favori.htm\"><strong>Kemer\u00a0FAVORI Hotel<\/strong><\/a><strong>,\u00a0<\/strong>5 stars, 5.000 sq.m. (Dokap Co.Inc.)<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/antalya-kemer-rutotel\/\" data-type=\"post\" data-id=\"170\">Antalya Kemer RUTOTEL<\/a> <\/strong>(Ruto Co. Inc.)10.000 sq. m.<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>Izmir\u2013Selcuk PAMUCAK Aqua Fantasy Touristic Facilities\u00a0<\/strong><\/a>(Buyuk Co. Inc.)<br><strong>\u00a0(<\/strong>hyperlink provided) \u00a0 <\/p>\n\n\n\n<p><strong>Ankara GOKKUSAGI Compound &#8211; Nursing School<\/strong>\u00a0(Bayindir Co.Inc.)<\/p>\n\n\n\n<p><strong>Adana Incirlik VSF Building (Vehicle Search Facility) <\/strong>(NATO + USAF)<br><br><strong>Istanbul Finance &amp; Tax Headquarters Building, <\/strong>12.000 sq.m. (Emek Constr.Co.Inc.)\u00a0\u00a0<br><br><strong>Adana-Incirlik\u00a0NATO\u00a0Air Base Security Battalion Commandership Bldg.<\/strong> 4.000 sq.m.(NATO)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBUDuzceTip\/TipMorfoloji.htm\"><strong>AIBU Duzce Campus Morphology Block of Faculty of Medicine<\/strong><\/a> 11.000 sq.m.(Abant Izzet Baysal University)\u00a0(Mechanical &amp; Electrical Engineering Design)\u00a0\u00a0<br><br><strong>Aydin\/Didim Wastewater Treatment Plant <\/strong>(Didim Municipality)<br>&#8211; Admin. Bldg.<br>&#8211; Security Bldg.<br>&#8211; Chlorination Bldg.\u00a0<br>&#8211; Water Elimination Bldg.<br><br><strong>Mugla\/Marmaris Wastewater Treatment Plant, <\/strong>Administration and Security Buildings (Marmaris Municipality)\u00a0<br><br><strong>Istanbul Haydarpasa Port Supervisory Bldg.<\/strong>, 700 sq.m. (Ministry of Public Works)<br><br><strong>ILYINKA\/Siberia Shopping Center, <\/strong>Russia 1.800 sq.m. (Sibtek Co. Inc.) <\/p>\n\n\n\n<p><strong>ILYINKA\/Siberia Nursing House, <\/strong>Russia 2.000 sq.m. (Sibtek Co. Inc.)<br><br><strong>RYAD<\/strong> <strong>Farmhouses Complex, <\/strong>Saudi Arabia (Private client)<\/p>\n\n\n\n<p><strong>Edirne E. RUHI BALTA Hotel<\/strong>, 3.500 sq.m. (Private Client)<br><br><strong>Konya\/Ilgin Emlak Kredi Bank Branch Office Bldg.,\u00a0<\/strong>2.000 sq.m.<br>(State Emlak Kredi Bank.)<br><br><strong>Edirne\/Kesan Emlak Kredi Bank Branch Office Bldg.,\u00a0<\/strong>2.000 sq.m. (State<br>Emlak Kredi\u00a0Bank)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Muhammed Tolon Hotel &amp; Swimming Pool <\/strong>, 3 stars, 60 beds (Private client)\u00a0<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum Information Office Bldg.<\/strong>, 250 sq.m. (State Tourism Bank)<br><br><strong>Ankara &#8211; Kurtulus Apartment Houses (<\/strong>48 Apartments,\u00a06.000 sq.m\u00a0<br>(State Emlak Kredi\u00a0Bank)<br><br><strong>Adana\/Incirlik Air Base Post Office Bldg,<\/strong> (USAF)<br><br><strong>Adana\/Incirlik Air Base, Guest House<\/strong> (USAF)<br><br><strong>Ankara\/ Murted Air Base, Guest House<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Aydin\/Didim BUYUKEGE Holiday Village<\/strong>, 700 houses (Private client)<\/p>\n\n\n\n<p><strong>Aydin\/Didim KUMKENT Holiday Village<\/strong>, 850 houses (Private client)\u00a0<\/p>\n\n\n\n<p><strong>Izmir\/Cesme Holiday Village<\/strong>, 400 houses (Private Koop.)<\/p>\n\n\n\n<p><strong>Mugla\/FETHIYE Touristic Rental Facilities<\/strong>, 3.500 sq.m. ( Fethiye Municipality)<\/p>\n\n\n\n<p><strong>Antalya\/Serik Holiday Village<\/strong>,\u00a0800 units (Private\u00a0client)\u00a0<\/p>\n\n\n\n<p><strong>Erzurum Military Guest House<\/strong>,\u00a02.500 sq.m. (Ministry of Defense)<\/p>\n\n\n\n<p><strong>Izmir\/Cesme Holiday Village<\/strong>, 400 houses-units (Private Koop.)<\/p>\n\n\n\n<p><strong>TOBANK Erzurum Branch Office <\/strong>(Bank Bldg.), 1.100 sq.m.<br>(TOBANK Gen. Directorate)<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum AKIN Holiday Compound,<\/strong>\u00a0370 houses (Ak\u0131n Co.Ltd.)<\/p>\n\n\n\n<p><strong>Mersin Muhittin Develi Primary School Building <\/strong>(Ministry of Education)<\/p>\n\n\n\n<p><strong>Antalya\/Manavgat Titreyengol Holiday Village<\/strong>,\u00a0600 beds (Private Client)<\/p>\n\n\n\n<p><strong>Antalya KAS Hotel &#8211;\u00a0<\/strong>4 stars, 200 beds (Ankara Journalists&#8217; Association)<\/p>\n\n\n\n<p><strong>Ankara Golbasi Elementary School Bldg. (<\/strong>TEKState Electricity Institution)<\/p>\n\n\n\n<p><strong>\u00a0Ankara OR-AN Villa<\/strong>, 600 sq.m (BM Holding)\u00a0<\/p>\n\n\n\n<p><strong>\u00a0Ankara ELVANKOY Mass Houses\u00a0(<\/strong>Ankara Municipality)<\/p>\n\n\n\n<p><strong>Ankara EMTA\/MITAS\u00a0General Directorate Bldg. <\/strong>1.500 sq.m.(EMTA Co.Inc.)\u00a0<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum Holiday Village<\/strong>, 144 houses\u00a0 (Private\u00a0client)\u00a0(Mech. &amp; Elect. Eng. design)<\/p>\n\n\n\n<p><strong>Mersin\/Tasucu Hotel,\u00a0<\/strong>2.450 sq.m.\u00a0 (State Provinces Bank)<br><br><strong>Bartin\/Kurucasile Hotel<\/strong>,\u00a01.500 sq.m.\u00a0 (State Provinces Bank)<br><br><strong>SSK Balikesir Branch Office Bldg.<\/strong>, 2.000 sq.m. (State Social Security Inst.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kaplancali-business-center\/\" data-type=\"post\" data-id=\"173\">Istanbul Kaplancali Business Center<\/a><\/strong>, 4.500 sq.m. (Klima Co. Inc.)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-1-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>References between 1975-1978<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-1-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><em>Engineering designs completed by <strong>Fatma Colasan<\/strong> and <strong>Aziz Inac<\/strong> in SSK-State Social Security Institution General Directorate,\u00a0 Construction Works Department.<\/em><\/p>\n\n\n\n<p><strong>De<u>sign services of the\u00a0 facilities of SSK <\/u><\/strong>(Ministry of Social Security Inst.)<br>&#8211; 125-bed Urfa and Ordu Hospitals<br>&#8211; Eskisehir Mass Houses\u00a0for Workers<br>&#8211; BoyabatMass Houses\u00a0for Workers\u00a0<br>&#8211; Duragan Mass Houses\u00a0forWorkers<br>&#8211; Golcuk Outpatient Clinics<\/p>\n\n\n\n<p><strong><u>Design supervision\u00a0services of the facilities of\u00a0 SSK<br>(Minister of Social Security Inst.)<\/u><br><\/strong>&#8211; Renovation of Antalya Hospital\u00a0<br>&#8211; Renovation of Istanbul Pasabahce Hospital\u00a0<br>&#8211; Ankara Diskapi Operation Theatres and Intensive Care Bldg.<br>&#8211; Ankara Ulucanlar Maternity Hospital<br>&#8211; Neurosyrurgical Block of Ankara Etlik Hospital\u00a0<br>&#8211; Air Conditioning Renovation of the Children&#8217;s Hospital at Ankara Diskapi\u00a0\u00a0<br>&#8211; Health Care Center<br>&#8211; Nevsehir Kozakli Thermal SPA Facilities<br>&#8211; Ankara Etlik Compound &#8211; Archive and Storage Bldg.<br>&#8211; Ankara Kizilay (Red Crescent) Business Center<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-2-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>International Projects<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-2-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><em>(Projects implemented outside Turkiye, or Engineering services provided for foreign clients, or projects financed by IFIs (International Funding Institutions.)<br><br><\/em><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NovokuznetskHastane\/NovokuznetskHastane.htm\"><strong>NOVOKUZNETSK\/Siberia\u00a0Surgical Hospital\u00a0<\/strong><\/a>,\u00a0500 beds, 41.000 sq.m.<br>(PETKONTUR Co. Inc. &amp; Zapsib Steel Factory, Russia)\u00a0<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia Polyclinics Bldg.<\/strong>, 8.500 sq.m.<br>(Petkontur Co. Inc.\u00a0 &amp; Zapsib Steel Factory, Russia)<br><br><strong>NOVOKUZNETSK\/Siberia Bread Factory, <\/strong>Russia (Petkontur Co. Inc.&amp; Zapsib Steel Factory)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia\u00a0Brewery<\/strong>, Russia(Petkontur Co. Inc.&amp; Zapsib Steel Factory)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/ Siberia Zapsib Steel Factory General Directorate Bldg, <\/strong>Russia<br>(Petkontur Co. Inc.&amp; Zapsib Steel Factory)<\/p>\n\n\n\n<p><strong>WESTINGHOUSE Ankara Electronics Factory<\/strong> (Preliminary Mechanical\u00a0 Design (WESSA)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AnkaraHilton\/AnkaraHilton.htm\"><strong>Ankara HILTON Hotel<\/strong><\/a>, 5 stars,\u00a0700 beds, 33.000 sq.m.<br>(Hilton International\u00a0 &amp;\u00a0 MNG TARGEM) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SheratonKongre\/SHERATON.htm\"><strong>ANKARA SHERATON\u00a0 Conference &amp; Culture Center and\u00a0&#8216;Luxury Collection&#8217; Hotel<\/strong><\/a> 35.000 sq.m.- TURSER Co.Inc. (NUROL)\u00a0<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AntalyaFalez\/AntalyaFalez.htm\"><strong>Antalya FALEZ International Hotel<\/strong><\/a>, 5 stars, 700 beds, 40.000 sq.m.\u00a0<br>(Steigenberger &amp; OR-SA) <\/p>\n\n\n\n<p><strong>BABUSHKIN Hospital Preliminary Mechanical Design<\/strong>, Russia\/Republic of Buryatya, 1000 beds, 100.000 sq.m.(MIR Co. Inc.)<\/p>\n\n\n\n<p><strong>ILYINKA\/Siberia Shopping Center, <\/strong>Russia 1.800 sq.m. (Sibtek Co. Inc.) <\/p>\n\n\n\n<p><strong>ILYINKA\/Siberia Nursing House, <\/strong>Russia 2.000 sq.m. (Sibtek Co. Inc.)<\/p>\n\n\n\n<p><strong>RYAD<\/strong> <strong>Farmhouses Complex, <\/strong>Saudi Arabia (Private client)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/sevilla-expo-92-spain-world-fair\/\" data-type=\"post\" data-id=\"154\">Sevilla EXPO 92 Spain World Fair<\/a><\/strong>, Pavillion of Turkiye ((Ministry of Culture)<\/p>\n\n\n\n<p><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia (Preliminary Mechanical Design)80.000 sq.m.(MIR)<\/p>\n\n\n\n<p><strong>NEBITCI Hotel &#8211; Nebitdag \/ Turkmenistan,<\/strong>\u00a07.000 sq.m. (Private client)<br>( Design Consultancy Services)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kaia-north-relocation-kabul-afghanistan-facilities\/\" data-type=\"post\" data-id=\"139\">Kaia North Relocation Kabul\/Afghanistan Facilities<\/a> <\/strong>(NAMSA-NATO Europe)<br>&#8211; HQ Main and AOC\/Force Protection\/AIS-FSO Bldg.<br>&#8211; Passenger Terminal (PRC)<br>&#8211; Cargo Office and Cargo Tents<br>&#8211; Helicopter Hangar<br>&#8211; CIS Building<br>&#8211; Workshop\/Supply Building<br>&#8211; Camp Facilities Maintenance Building<br>&#8211; Dog Kennel<br>&#8211; Fuel Station and Car Wash<br>&#8211; Solid Garbage Treatment Plant<br>&#8211; Accommodations Buildings Type A, B and C<br>&#8211; MWA\/Gymnasium<br>&#8211; Laundry Building<br>&#8211; Dining Hall and Main Kitchen<br><strong>&#8211; <\/strong>Meteorology Building- Follow-me Building<br>&#8211; SNIC Building<br><br><strong>Erzurum\/Kargapazari Air Defense Radar Facilities<\/strong> (NATO)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/q-west-iraq-theater-transportation-mission-area-buildings\/\" data-type=\"post\" data-id=\"134\">Q-West\/IRAQ Theater Transportation Mission Area Buildings<\/a><\/strong> (US Army Corps of Engineers) (Design-Build project, design undertaken by GEN-TES)<\/p>\n\n\n\n<p><strong>Three Squadron Operations + Wing Operations and three Squadron Operations Buildings with CBR shelters<\/strong>\u00a0<strong>at different provinces of Turkiye <\/strong>(NATO + USAF)(CBR = Military shelters protected against chemical, biological and nuclear attacks.)<\/p>\n\n\n\n<p><strong>Niger Air Base 201 Compound Near Agades, <\/strong>total\u00a0\u00a0 area of 25 sq. kilometers (25,000,000 sq.m.) (Also called \u2018USAF Compound\u2019) (USAF &amp; GEMAS Co. Inc.)<br>&#8211; Aircraft Support Facilities<br>&#8211; Base Camp and Support Buildings<br>&#8211; Living Quarters and Personnel Facilities<br>&#8211; Base Roads and Utilities<br>&#8211; Perimeter Fence and Guard Towers<br>&#8211; Fuel Storage and Maintenance Areas<br>&#8211; Life Support and Logistical Facilities<br>&#8211; Training and Operations Buildings<br>&#8211; Aircraft Hangars &#8211; Barracks<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan USAF Compound<\/strong> (USAF &#8211; GEMAS Co. Inc.) \u00a0<\/p>\n\n\n\n<p>&#8211; ACCOM &amp; CIS Buildings<br>&#8211; Warehouses 1-2-3-4<br>&#8211; Admin Building<br>&#8211; Guard House<br>&#8211; Pump House<br>&#8211; H-Diesel Generator<br>&#8211; MDP-synpanel &amp; fuel tank<\/p>\n\n\n\n<p><strong>SMOLENSKAYA Housing &amp; Business Center &#8211; <\/strong>Moscow\/Russia<br>(Sibtek\u00a0Co. Inc.)\u00a0\u00a0\u00a0<\/p>\n\n\n\n<p><strong>ANAPA Mass Houses and Social Facilities, <\/strong>Russia (KLIMA Co. Inc.) <\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan COMKAF HQ Office Accommodations <\/strong>(FEM JV-GEMAS) &#8211; Kilo Hangar East &amp; West Wings<br>&#8211; BOC Building Renovation<br>&#8211; New COMCAF HQ Building<br>&#8211; TLS Building Renovation<br>&#8211; Hangar<br>&#8211; Container Park<\/p>\n\n\n\n<p><strong>Renovation of Ankara Balgat Sports Hall <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Renovation of Adana Incirlik Sports Hall <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Istanbul SABIHA GOKCEN\u00a0 AIRPORT <\/strong>(1999 NATO Project,later civilian airport) <strong>\u00a0\u00a0<br><\/strong>(total of 37.460 sq.m.- 1999)<br>&#8211; Domestic Flights Terminal Bldg., 4.000 sq.m.<br>&#8211; Cargo Bldg., 6.000 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Security Bldg., 1.800 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Guest House, 1.500 sq.m.\u00a0\u00a0<br>&#8211; Police Security Bldg., 4.700 sq.m.<br>&#8211; Vehicle Maintenance Workshop, 4.000 sq.m.\u00a0\u00a0<br>&#8211; Private Companies&#8217; Services Bldg., 4.760 sq.m.\u00a0\u00a0<br>&#8211; Customs Bldg., 1.650 sq.m.\u00a0\u00a0<br>&#8211; Accident-Fire, Fire Brigade Bldg., 4.050 sq.m.\u00a0\u00a0<br>&#8211; Lodgings, 50 houses<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base &#8211; Trailer-Truck Aircraft Facility <\/strong>(NATO)<br>&#8211; Electronics Workshop &amp; Field Support Workshop Bldgs.<br>&#8211; Maintenance Commandership Headquarters<br>&#8211; BEM\/GBE Commandership Bldg.<br>&#8211; Parachute Center<br>&#8211; Chargery<br>&#8211; Production Workshop Line<br>&#8211; Maintenance Bldg.<br>&#8211; Supply Storage Bldg.<br>&#8211; Central Heating Plant &amp; Exterior Heating Network<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AAFESPX\/AAFES_PX_web.htm\"><strong>Adana\/Incirlik NATO Air Base AAFES PX (BX) Shopping Center<\/strong><\/a><br>AAFES, Zirndorf \/ GERMANY\u00a0(Mech. Design + Tender Consultancy + Constr. supervision) <\/p>\n\n\n\n<p><strong>Konya ILGIN Power Plant &amp; Coal Mines &#8211; Admin. &amp; Technical\u00a0 Buildings \u00a0Complex\u00a0<\/strong>,12.000 sq.m. (Konya Ilgin Electric Production B.V.\u00a0&#8211; USA\u00a0)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KhantyMansisky\/KhantyMansisky.htm\"><strong>KHANTY MANSISKY\u00a0 General Hospital &#8211;\u00a0Siberia\/Russia<\/strong><\/a><br>500 beds, 41.000 sq.m. (Lukova Co. Inc.)<br>(Multi-disciplinary design under mother company ODTM Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kogalym-maternity-hospital\/\" data-type=\"post\" data-id=\"123\">Kogalym Maternity Hospital<\/a><\/strong> (Siberia\/Russia) 240 beds, 10,200 sq.m.<br>(multi-disciplinary design under mother company ODTM Co. Inc.) (Lukova Co. Inc.)<\/p>\n\n\n\n<p><strong>Yalova Psychotherapy &amp; Rehabilitation Int. Hospital,\u00a0<\/strong>14.000 sq.m.<br>(Federation of Red Crescent &amp; Red Cross)\u00a0<br>(Mechanical &amp; Electrical Eng. Design and Tender Consultancy)<\/p>\n\n\n\n<p><strong>Protection and Sustainable Development of Natural Resources and Biodiversity in Kirklareli Yildiz Mountains of Turkiye <\/strong>(UNESCO)<br>(GEN-TES prepared the designs of the HVAC and sanitary systems of the Educational Buildings and provided site supervision service.) (AGRIN Co. Ltd.)<\/p>\n\n\n\n<p><strong>MOSCOW New Police Center, <\/strong>Russia12.000 sq.m. (SIBTEK Co. Inc.)<\/p>\n\n\n\n<p><strong>MOSCOW Business Center &#8211; <\/strong>Russia, 11.000 sq.m. (Sibtek Co. Inc.) \u00a0<\/p>\n\n\n\n<p><strong>MOSCOW Smolenskaya Housing &amp; Business Center, <\/strong>Russia (SIBTEK Co. Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NationalBank\/NationalBank.htm\"><strong>UFA NATIONAL BANK &#8211; Bashkortostan-Russia<\/strong><\/a>, 5.600 sq.m.\u00a0(Klima Co. Inc.)<br>(Multi-disciplinary design under mother company ODTM Co. Inc.)<\/p>\n\n\n\n<p><strong>IZMIR Military Operations Building<\/strong> (NATO)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\">Adana Incirlik Air Base Family Eagle Housing<\/a><\/strong>, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base VSF (Vault Support Facility) <\/strong>(USAF) (GEMAS Co. Inc.)<\/p>\n\n\n\n<p><strong>Ankara Murted NATO Air Base Avionics Workshop <\/strong>(NATO)<\/p>\n\n\n\n<p><strong>Ankara Murted Air Base &#8211; Protected Avionics Workshop for F1-16s.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Family Services Center <\/strong>&#8211; Turkiye (USAF) <\/p>\n\n\n\n<p><strong>Adana Incirlik Air Base Mix Use Facility<\/strong>(NATO) <strong><br>&#8211; <\/strong>Security Police Operations Bldg.<br>&#8211; Fuels Laboratory<br>&#8211; New Gymnasium<br>&#8211; Radar Transmitter Building<br>&#8211; Medical Warehouse<br>&#8211; Field Support buildings (NATO)<\/p>\n\n\n\n<p><strong>Three Social Facilities in Adana, Balikesir and Elmadag<\/strong> (NATO+USAF)<\/p>\n\n\n\n<p><strong>Balikesir Air Base Admin. Bldg. and Fuel Distribution Facilities<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Diyarbakir\/ Pirinclik Radar Base Security Bldg.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Renovation of Adana Incirlik Library Building <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base Avionics Facility<\/strong> (NATO + USAF) <\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base Post Office Bldg,<\/strong> (USAF)<\/p>\n\n\n\n<p><strong>Konya ILGIN Electric Production Facilities<\/strong> (B.V. USA)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base, Guest House<\/strong> (USAF)<\/p>\n\n\n\n<p><strong>Ankara\/ Murted Air Base, Guest House<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Ankara Elmadag Radar Facilities <\/strong>(NATO)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline\u00a0 Station\u00a0<\/strong>(AAFES, Zirndorf &#8211; GERMANY)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-3-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Health Care Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-3-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NovokuznetskHastane\/NovokuznetskHastane.htm\"><strong>NOVOKUZNETSK\/Siberia\u00a0 Surgical Hospital\u00a0<\/strong><\/a>,\u00a0500 beds, 41.000 sq.m.<br>(PETKONTUR Co. Inc. &amp; Zapsib Steel Factory, Russia)\u00a0<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia Polyclinics Bldg.<\/strong>, 8.500 sq.m.<br>(Petkontur Co. Inc.\u00a0 &amp; Zapsib Steel Factory, Russia) <\/p>\n\n\n\n<p><strong>ILYINKA\/Siberia Nursing House, <\/strong>Russia 2.000 sq.m. (Sibtek Co. Inc.)\u00a0<\/p>\n\n\n\n<p><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia(Preliminary Mechanical Design)80.000 sq.m.(MIR) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KhantyMansisky\/KhantyMansisky.htm\"><strong>KHANTY MANSISKY\u00a0 General Hospital &#8211;<\/strong><\/a><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KhantyMansisky\/KhantyMansisky.htm\"><strong>\u00a0Siberia\/Russia<\/strong><\/a><br>500 beds, 41.000 sq.m. (Lukova Co. Inc.) <br>(Multi-disciplinary design rendered under mother company ODTM Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kogalym-maternity-hospital\/\" data-type=\"post\" data-id=\"123\">KOGALYM Maternity Hospital<\/a><\/strong> (Siberia\/Russia) 240 beds, 10,200 sq.m.<br>(multi-disciplinary design under mother company ODTM Co. Inc.) (Lukova Co. Inc.)<\/p>\n\n\n\n<p><strong>Yalova Psychotherapy &amp; Rehabilitation Int. Hospital,\u00a0<\/strong>14.000 sq.m.<br>(Federation of Red Crescent &amp; Red Cross)\u00a0<br>(Mechanical &amp; Electrical Eng. Design and Tender Consultancy)<\/p>\n\n\n\n<p><strong>Izmir 9 EYLUL University Hospital<\/strong>, 700 beds, 30,000 sq.m.\u00a0(heating through thermal water)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-bayindir-hospital\/\" data-type=\"post\" data-id=\"147\">Ankara BAYINDIR Hospital<\/a>,<\/strong> 185 beds, 16.000 sq.m.<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBUDuzceTip\/TipMorfoloji.htm\"><strong>A<\/strong><strong>IBU Duzce Campus &#8211; Faculty of Medicine<\/strong><\/a>, 33.000 sq.m.<br>(Abant Izzet Baysal University)\u00a0 (heating through thermal water)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBUDuzceTip\/TipMorfoloji.htm\"><strong>AIBU Duzce Campus Morphology Block of Faculty of Medicine<\/strong><\/a><br>11.000 sq.m.(Abant Izzet Baysal University)\u00a0<br>(Mechanical &amp; Electrical Engineering Design)\u00a0<\/p>\n\n\n\n<p><strong>Ankara BILKENT University Molecular Biology Laboratories, Animal House\u00a0 and Gene Research Facility<\/strong>,\u00a06,500 sq.m. (Bilkent University)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SelcukUniversitesi\/SelcukUniversitesi.htm\"><strong>Konya SELCUK UNIVERSITY,\u00a0 Faculty of Medical Sciences\u00a0 &amp; Hospital<\/strong><\/a><br>90.000 sq.m.\u00a0<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-etimesgut-military-hospital-renovation\/\" data-type=\"post\" data-id=\"144\">Ankara Etimesgut Military Hospital Renovation of Operation Theaters and Intensive Care Unit<\/a>, <\/strong>Etimesgut Military Hospital\u00a0<\/p>\n\n\n\n<p><strong>Urfa Hospital<\/strong> \u2013 125 beds (State Social Security\u00a0 Inst.)<br><br><strong>Ordu Hospital<\/strong> \u2013 125 beds (State Social Security\u00a0 Inst.)<br><br><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/aibu-duzce-konuralp-research-educational-hospital\/\" data-type=\"post\" data-id=\"136\">AIBU Duzce Konuralp Research &amp; Educational Hospital<\/a>, <\/strong>3.000 sq.m.<br>(Abant Izzet Baysal University)<\/p>\n\n\n\n<p><strong>Istanbul Golcuk Outpatient Clinics <\/strong>(State Social Security\u00a0 Inst.)<\/p>\n\n\n\n<p><strong>SSK Malatya Hospital Renovation <\/strong>200 (existing) + 455 (new) beds, 40,000 sq.m<br>(State Social Security Institution)\u00a0<\/p>\n\n\n\n<p><strong>BABUSHKIN Hospital Preliminary Mechanical Design,<br><\/strong>Russia\/Republic of Buryatya, 1000 beds, 100.000 sq.m.(MIR &amp; SIBTEK Co. Inc.)<\/p>\n\n\n\n<p><strong>Mersin\/ Tarsus Hospital<\/strong>, 265 beds (SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara\/GOLBASI\u00a0Health Care Center<\/strong>,\u00a02.000 sq.m.\u00a0(TEK State Electricity\u00a0 Inst.)<\/p>\n\n\n\n<p><strong>Ankara GOKKUSAGI Compound &#8211; Nursing School<\/strong>\u00a0(Bayindir Co.Inc.)<\/p>\n\n\n\n<p><strong>Renovation of Antalya Hospital<\/strong>\u00a0(SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Renovation of Istanbul Pasabahce Hospital<\/strong>\u00a0(SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara Diskapi Operation Theatres and Intensive Care Building<\/strong><br>(SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>SSK Ankara Diskapi Hospital Additional Bldg.<\/strong>\u00a0300 beds<br>(State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara Ulucanlar Maternity Hospital<\/strong> (SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara Etlik Hospital, Neurosyrurgical Block<\/strong>\u00a0(SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Nevsehir Kozakli Thermal SPA Facility<\/strong> (SSK State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara ERYAMAN Mass Housing Compound &#8211; Social Facilities<\/strong><br>(Total of 12.000 sq.m.)<br>&#8211; Health Clinics.<br>&#8211; Tennis Club<br>&#8211; Restaurant<br>&#8211; Greenhouses<br>&#8211; Garden\u00a0Cafe\u00a0<br>&#8211; Closed Swimming Pool<br>&#8211; Admin Bldg.<\/p>\n\n\n\n<p><strong>Artvin Nursing Home &amp; Business Center <\/strong>(Private client)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-4-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Accommodational Facilities &amp; Dwellings<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-4-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AnkaraHilton\/AnkaraHilton.htm\"><strong>Ankara HILTON Hotel<\/strong><\/a>, 5 stars,\u00a0700 beds, 33.000 sq.m.<br>(Hilton International\u00a0&amp;\u00a0 MNG TARGEM) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SheratonKongre\/SHERATON.htm\"><strong>Ankara SHERATON<\/strong><\/a><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SheratonKongre\/SHERATON.htm\"><strong>\u00a0 Conference &amp; Culture Center and\u00a0&#8216;Luxury Collection&#8217; Hotel<\/strong><\/a> 35.000 sq.m. (NUROL-TURSER)\u00a0<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AntalyaFalez\/AntalyaFalez.htm\"><strong>Antalya FALEZ International Hotel<\/strong><\/a>, 5 stars, 700 beds, 40.000 sq.m.\u00a0<br>(Steigenberger &amp; OR-SA) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/BilkentOtel\/BilkentOtel.htm\"><strong>Ankara BILKENT\u00a0Multi-Purpose Hall (1000 pax), Additional 5 Star Hotel\u00a0&amp; Renovation of Existing 4 Star Hotel<\/strong><\/a><strong>, Conference Center\u00a0<\/strong>19.000 sq.m. (Bilintur Co. Inc.)<strong>\u00a0<\/strong><\/p>\n\n\n\n<p><strong>NEBITCI Hotel &#8211; Nebitdag \/ Turkmenistan<\/strong>,<strong>\u00a0<\/strong>7.000 sq.m. (Private client)<br>( Design Consultancy Services)<\/p>\n\n\n\n<p><strong>Antalya\/Manavgat\u00a0AKPINAR\u00a0Touristic Facilities &#8211; Apart Hotel Bungalows<br><\/strong>4 stars, 1000 beds, 33.800 sq.m. (Akpinar Co.In<em>c<\/em>.)<\/p>\n\n\n\n<p><strong>Canakkale\u00a0CON-TUR Touristic Facilities<\/strong>, 15.000 sq.m. (Private client)<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum OZLEM Touristic Facilities &amp; Swimming Pool <\/strong>(Private client)<strong> \u00a0<br>&#8211; <\/strong>Guest Rooms Building\u00a0\u00a0<br>&#8211; Swimming Pool<br>&#8211; Restaurant\u00a0\u00a0Building \u00a0<\/p>\n\n\n\n<p><strong>Mugla\/Koycegiz Iztuzu Kucukgol Hotel<\/strong>, 16.600 sq.m (State Tourism Bank)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/FavoriOtel\/favori.htm\"><strong>Kemer\u00a0 FAVORI Hotel<\/strong><\/a><strong>,\u00a0<\/strong>5 stars, 5.000 sq.m. (Dokap Co.Inc.) <\/p>\n\n\n\n<p><strong>Antalya\/Manavgat Titreyengol Holiday Village<\/strong>,\u00a0600 beds (Private Client)<\/p>\n\n\n\n<p><strong>Antalya\/Alanya BERTUR Hotel<\/strong>, 4 stars,\u00a010.000 sq.m. (Bertur Co.Inc.) <\/p>\n\n\n\n<p><strong>Antalya\/Alanya OBAKOY Hotel<\/strong>, 4 stars, 350 beds, 5.000 sq.m. (Anitsal Co.Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/antalya-kemer-rutotel\/\" data-type=\"post\" data-id=\"170\">Antalya Kemer RUTOTEL<\/a> <\/strong>(Ruto Co. Inc.)10.000 sq.m. <strong>\u00a0<\/strong><\/p>\n\n\n\n<p><strong>Mersin\/Tasucu\u00a0Hotel,\u00a0<\/strong>2.450 sq.m.\u00a0 (State Provinces Bank) \u00a0 <\/p>\n\n\n\n<p><strong>Bartin\/Kurucasile Hotel<\/strong>,\u00a01.500 sq.m.\u00a0 (State Provinces Bank)\u00a0 \u00a0 <\/p>\n\n\n\n<p><strong>Edirne E. RUHI BALTA Hotel<\/strong>, 3.500 sq.m. (Private Client)<\/p>\n\n\n\n<p><strong>Antalya\/Kas Hotel &#8211;\u00a0<\/strong>4 stars, 200 beds (Ankara Journalists&#8217; Association)<br><br><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/TPAOBatman\/TPAOBatman.htm\"><strong>TPAO Batman Recreational Facility and Guest House<\/strong><\/a><strong>,\u00a0<\/strong>3.500 sq.m.<br>Turkish Petroleum Works Co.Inc\u00a0 (Design &amp; constr. supervision)<strong>\u00a0<\/strong><\/p>\n\n\n\n<p><strong>SMOLENSKAYA Housing &amp; Business Center &#8211; <\/strong>Moscow\/Russia (Sibtek\u00a0Co. Inc.)\u00a0\u00a0\u00a0\u00a0<\/p>\n\n\n\n<p><strong>ANAPA Mass Houses and Social Facilities, <\/strong>Russia (KLIMA Co. Inc.)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Muhammed Tolon Hotel &amp; Swimming Pool<\/strong>, 3 stars, 60 beds<br>(Design + site supervision) (Private client)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris AMAZON Camping Facilities &amp; Swimming Pool<\/strong><br>(Design + site supervision) (Private\u00a0client)<\/p>\n\n\n\n<p><strong>Hatay Touristic Hotel<\/strong>, 4 stars, 10.000 sq.m.(Governorship of Hatay)<\/p>\n\n\n\n<p><strong>Aydin\/Didim KUMKENT Holiday Village<\/strong>, 850 houses (Private client)\u00a0<\/p>\n\n\n\n<p><strong>Aydin\/Didim BUYUKEGE Holiday Village<\/strong>, 700 houses (Private client)<\/p>\n\n\n\n<p><strong>Antalya\/Serik Holiday Village<\/strong>,\u00a0800 units (Private\u00a0client)<\/p>\n\n\n\n<p><strong>Izmir\/Cesme Holiday Village<\/strong>, 400 houses-units (Private Koop.)<\/p>\n\n\n\n<p><strong>Gulluk ORJAN-2 Holiday Compound <\/strong>(Private Client)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>Izmir\u2013Selcuk PAMUCAK Aqua Fantasy Touristic Facilities\u00a0<\/strong><\/a>(Buyuk Co. Inc.)<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan COMKAF HQ Office Accommodations <\/strong>(FEM JV-GEMAS) &#8211; Kilo Hangar East &amp; West Wings<br>&#8211; BOC Building Renovation<br>&#8211; New COMCAF HQ Building<br>&#8211; TLS Building Renovation<br>&#8211; Hangar<br>&#8211; Container Park<\/p>\n\n\n\n<p><strong>Sinop\/Boyabat &amp; Sinop\/ Duragan Mass Houses\u00a0for Workers<\/strong><br>(SSK Social Security Ins. General Directorate)<\/p>\n\n\n\n<p><strong>Ankara\/Sincan &amp; Bursa\u00a0Mass Houses for Immigrants<br><\/strong>(Emlak Konut Co.Inc.)\u00a0<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\">Adana Incirlik Air Base Family Eagle Housing<\/a><\/strong>, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<\/p>\n\n\n\n<p><strong>Ankara Grand National Assembly\u00a0&#8211; Staff Lodging Buildings<br><\/strong>220 apartment houses (design &amp; site supervision)\u00a0 (TC Grand National Assembly)<\/p>\n\n\n\n<p><strong>Ankara Yenikent Mass Houses<\/strong>, 5.000 houses ( Yenikent\u00a0 Koop.)<\/p>\n\n\n\n<p><strong>Mardin Mass Houses<\/strong>, 1.000 houses(Private client)<\/p>\n\n\n\n<p><strong>Ankara MTA Staff Housing Cooperative Houses<\/strong>, 256 houses (MTA Koop.)<\/p>\n\n\n\n<p><strong>ANAPA\/Russia Mass Houses and Social Facilities (<\/strong>KLIMA Co. Inc.)<\/p>\n\n\n\n<p><strong>Tokat Sumerbank Shopping Hall &amp; Lodging House,<\/strong>\u00a0 2.000 sq.m.<br>(Sumerbank Gen. Directorate)\u00a0<\/p>\n\n\n\n<p><strong>Ankara &#8211; Kurtulus Apartment Houses (<\/strong>48 Apartments,\u00a0 6.000 sq.m\u00a0<br>(State Emlak Kredi\u00a0Bank)<\/p>\n\n\n\n<p><strong>Ankara ELVANKOY Mass Houses\u00a0(<\/strong>Ankara Municipality)<\/p>\n\n\n\n<p><strong>Cankiri MKE Heavy Industry and Equipment Factory &#8211; Lodgings For Staff and Workers\u00a0<\/strong>, 48 Apartments (MKE Gen.Directorate)<\/p>\n\n\n\n<p><strong>Mugla\/Fethiye Touristic Rental Facilities<\/strong>, 3.500 sq.m. ( Fethiye Municipality)<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum AKIN Holiday Compound,<\/strong>\u00a0370 houses (Ak\u0131n Co.Ltd.)<\/p>\n\n\n\n<p><strong>Erzurum Military Guest House<\/strong>,\u00a02.500 sq.m. (Ministry of Defense)<\/p>\n\n\n\n<p><strong>Ankara OR-AN Villa<\/strong>, 600 sq.m (BM Holding)<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum Holiday Village<\/strong>, 144 houses\u00a0 (Private\u00a0client) (Mech. &amp; Elect. Eng. design)\u00a0<\/p>\n\n\n\n<p><strong>Kaarabuk SSK Hospital-Additional Dining Hall and Doctors&#8217; Lodgings\u00a0<br><\/strong>2.100 sq.m. (State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Ankara Cankaya Gendarme School Commandership,\u00a0 Social Facilities &amp; Lodgings\u00a0(<\/strong>Ministry of Public Works)\u00a0<\/p>\n\n\n\n<p><strong>Adana Incirlik NATO Air Base Guest House\u00a0(<\/strong>USAF BCE)\u00a0<\/p>\n\n\n\n<p><strong>Ankara\/ Murted Air Base, Guest House<\/strong> (NATO)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-5-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Administrative Buildings &amp; Banks<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-5-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>MOSCOW New Police Center &#8211; Russia<\/strong>, 12.000 sq.m. (Sibtek Co. Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/NationalBank\/NationalBank.htm\"><strong>UFA NATIONAL BANK &#8211; Bashkortostan-Russia<\/strong><\/a>, 5.600 sq.m.\u00a0(Klima Co. Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AnkaraBuyuksehir\/AnkaraBuyuksehir.htm\"><strong>Ankara Metropolitan Municipality Palace<\/strong><\/a>,<strong>\u00a0<\/strong>85.000 sq.m.<br>(Ankara\u00a0Metropolitan Municipality)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBURektorluk\/AUBIRektorluk.htm\"><strong>AIBU Bolu Campus Presidential Bldg<\/strong><strong>.<\/strong><\/a><strong>,\u00a0<\/strong>7.800 sq.m. (Abant Izzet Baysal University)\u00a0<\/p>\n\n\n\n<p><strong>Istanbul Haydarpasha Port Supervisory Bldg.<\/strong>, 700 sq.m. (Ministry of Public Works)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia Zapsib\u00a0Steel Factory General Directorate Bldg.\u00a0<\/strong>Russia\u00a0(Sibtek\u00a0Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-idil-general-directorate-bldg\/\" data-type=\"post\" data-id=\"162\">Ankara IDIL General Directorate Bldg<\/a>.<\/strong> 1.500 sq.m. (IDIL Co. Inc.)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Family Services Center <\/strong>&#8211; Turkiye (USAF)<\/p>\n\n\n\n<p><strong>Diyarbakir<\/strong><strong>\/ Pirinclik Radar Base Security Bldg.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Wastewater Treatment Plant, Administration and Security Buildings<\/strong> (Marmaris Municipality)\u00a0<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/batman-guest-house-social-facilities\/\" data-type=\"post\" data-id=\"150\">Batman Guest House\u00a0 &amp; Social Facilities<\/a><\/strong>,\u00a0 3.500 sq.m. TPAO\u00a0 Gen. Directorate of Turkish Petrolium\u00a0\u00a0 Co. Inc.<\/p>\n\n\n\n<p><strong>Adana-Incirlik\u00a0NATO\u00a0Air Base Security Battalion Commandership Bldg.<br><\/strong>4.000 sq.m.(NATO)<\/p>\n\n\n\n<p><strong>SSK Balikesir Branch Office Bldg.<\/strong>, 2.000 sq.m. (State Social Security Inst.)<\/p>\n\n\n\n<p><strong>Balikesir Air Base Admin. Bldg. and Fuel Distribution Facilities<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Diyarbakir\/Pirinclik NATO Radar Base\u00a0Security\u00a0Bldg. <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base Post Office Bldg.\u00a0(<\/strong>USAF) \u00a0<\/p>\n\n\n\n<p><strong>Mugla\/Bodrum Information Office Bldg.<\/strong>, 250 sq.m. (State Tourism Bank)<\/p>\n\n\n\n<p><strong>Konya\/Ilgin Emlak Kredi Bank Branch Office Bldg.,\u00a0<\/strong>2.000 sq.m. (State Emlak Kredi\u00a0Bank)<\/p>\n\n\n\n<p><strong>Edirne\/Kesan Emlak Kredi Bank Branch Office Bldg.,\u00a0<\/strong>2.000 sq.m. (State Emlak Kredi\u00a0Bank)<\/p>\n\n\n\n<p><strong>TOBANK Erzurum Branch Office (Bank Bldg.)<\/strong>, 1.100 sq.m.<br>(TOBANK Gen.Directorate)<\/p>\n\n\n\n<p><strong>Ankara Cankaya Gendarme School Commandership,\u00a0 Social Facilities &amp; Lodgings\u00a0(<\/strong>Ministry of Public Works)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kadikoy-governmental-complex\/\" data-type=\"post\" data-id=\"131\">Istanbul Kadikoy Governmental Complex<\/a> ,<\/strong> 43.000 sq.m. (Ministry of Public Works)<\/p>\n\n\n\n<p><strong>Ankara ALTINPARK Facilities<br>&#8211; <\/strong>Closed Olympic Swimming Pool<br>&#8211; Presidential Bldg.<br>-Greenhouses and Stables<strong>\u00a0<br>(<\/strong>Ankara Metropolitan Municipality) (Design and constr. supervision)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/MalatyaMerkezBank\/MalatyaMerkezBank.htm\"><strong>State National Bank Malatya Regional Headquarters and Staff Lodgings<\/strong><\/a>\u00a0<br>8.000 sq.m.\u00a0(State National Bank) (hyperlink provided)<\/p>\n\n\n\n<p><strong>State Electricity Institution (TEK)<br><\/strong>&#8211; Kahramanmaras Managemenet Center<br>&#8211; Kahramanmaras Cafeteria, Guest House and Admin. Bldg.<br>&#8211; Yenikoy Power Plant Recreational Bldg.<\/p>\n\n\n\n<p><strong>BOTAS Ankara General Directorate Bldg.\u00a0<\/strong>, 20.000 sq.m. (Botas Co.Inc.)<\/p>\n\n\n\n<p><strong>Gunal\u00a0Co.Inc. MNG Office Bldg.,\u00a0<\/strong>1.000 sq.m.(MNG Holding)<\/p>\n\n\n\n<p><strong>Bursa Pension Fund Regional Headquarters<\/strong>, 5.000 sq.m. (State Pension Fund Co.Inc.)<\/p>\n\n\n\n<p><strong>Adana City Potable Water Institution,\u00a0Admin Buildings<\/strong> (DSI State Hydraulic Works Inst.)<\/p>\n\n\n\n<p><strong>MESA Ankara General Directorate Bldg.<\/strong>, 6.500 sq.m. (Mesa Co.Inc.)<\/p>\n\n\n\n<p><strong>Ankara EMTA\/MITAS\u00a0General Directorate Bldg.<\/strong>, 1.500 sq.m.(EMTA Co.Inc.)\u00a0<\/p>\n\n\n\n<p><strong>Ankara AKBANK Regional Headquarters\u00a0Bldg.\u00a0<\/strong>6.500 sq.m.<br>(AKBANK Gen. Directorate)\u00a0<\/p>\n\n\n\n<p><strong>Istanbul Finance &amp; Tax Headquarters Building<br><\/strong>12.000 sq.m. (Emek Constr.Co.Inc.)\u00a0\u00a0<\/p>\n\n\n\n<p><strong>Ankara 300 Business Units (<\/strong>Ankara Commerce Stock Exchange)\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<br>(Complete Consultancy, Eng. &amp; Arch. disciplines)<\/p>\n\n\n\n<p><strong>Ankara Elmadag Radar Facilities <\/strong>(NATO)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-6-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Mix-use Compounds &amp; Complexes<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-6-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7.jpeg\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cMERKEZ ANKARA\u201d Mix Use Complex<\/a><\/strong><br>GEN-TES provided Mechanical Engineering Design Consultancy Services<br>(HVAC, Sanitary and Fire Fighting designs) during the Concept and Preliminary Design phases of the Complex.<br> <strong>Features:<br><\/strong>&#8211; Residential, office, retail and other functions on a single large parcel of 125.000 sq.m. Total construction area: 1,185,015 sq.m.<br>&#8211; Residential components, with 1578 units divided into different types and blocks, each with variations in apartment sizes.<br>&#8211; Commercial\/Office towers with parking and open spaces. Pasific Tower (Flagship Skyscraper, 66 floors, 300 m. high), Collective Office Tower\u00a0 and Terrace Office Tower &#8211; serving as office complexes.<br>&#8211; Retail-Commercial Zone (a 600 m. long open-air shopping street\/retail avenue with about 150 shops in its retail corridor)<br>&#8211; Offices (total of varying between 1425-1500 offices)<br>&#8211; Residential and mix-use blocks\u00a0 (Residential Block: 38 floors)<br>&#8211; Smaller City Suites and Villas<br>&#8211; Various social facilities, landscaped open areas and plazas, shared courtyards and gardens.<br>(Construction of some buildings, such as apartment houses-villas, hotels and some shopping areas continue in the year 2025)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/q-west-iraq-theater-transportation-mission-area-buildings\/\" data-type=\"post\" data-id=\"134\">Q-West\/IRAQ Theater Transportation Mission Area Buildings<\/a> <\/strong>(US Army Corps of Engineers) (Design-Build project, design undertaken by GEN-TES)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kaia-north-relocation-kabul-afghanistan-facilities\/\" data-type=\"post\" data-id=\"139\">Kaia North Relocation Kabul\/Afghanistan Facilities<\/a> <\/strong>(NAMSA-NATO Europe)<br>&#8211; HQ Main and AOC\/Force Protection\/AIS-FSO Bldg.<br>&#8211; Passenger Terminal (PRC)<br>&#8211; Cargo Office and Cargo Tents<br>&#8211; Helicopter Hangar<br>&#8211; CIS Building<br>&#8211; Workshop\/Supply Building<br>&#8211; Camp Facilities Maintenance Building<br>&#8211; Dog Kennel<br>&#8211; Fuel Station and Car Wash<br>&#8211; Solid Garbage Treatment Plant<br>&#8211; Accommodations Buildings Type A, B and C<br>&#8211; MWA\/Gymnasium<br>&#8211; Laundry Building<br>&#8211; Dining Hall and Main Kitchen<br>&#8211; Meteorology Building<br>&#8211; Follow-me Building<br>&#8211; SNIC Building<\/p>\n\n\n\n<p><strong>Niger Air Base 201 Compound near Agades, <\/strong>total\u00a0\u00a0 area of 25 sq. kilometers (25,000,000 sq.m.) (Also called as USAF Compound) (USAF &amp; GEMAS Co. Inc.)<br>&#8211; Aircraft Support Facilities<br>&#8211; Base Camp and Support Buildings<br>&#8211; Living Quarters and Personnel Facilities<br>&#8211; Base Roads and Utilities<br>&#8211; Perimeter Fence and Guard Towers<br>&#8211; Fuel Storage and Maintenance Areas<br>&#8211; Life Support and Logistical Facilities<br>&#8211; Training and Operations Buildings<br>&#8211; Aircraft Hangars<br>&#8211; Barracks<br><br><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia(Preliminary Mechanical Design)80.000 sq.m.(MIR<\/p>\n\n\n\n<p><strong>State Naval\u00a0Forces of Turkiye <\/strong>(Ministry of Defense)<br>&#8211; Izmir Foca Shooting Polygon, 3.000 sq.m.\u00a0<br>&#8211; Zonguldak\/Eregli Military Guest House, 2.500 sq.m.<br>&#8211; Istanbul Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Izmir Foca Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.<br>&#8211; Izmir Underwater Duty Group Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Ankara Elmadag Barracks, 500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound &#8211; Kitchen &amp; Cafeteria, 1.300 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound- Nursing House, 1.500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound &#8211; Central Heating Plant\u00a0<br>&#8211; Izmir Yolluca Island Lodgings,Central Heating Plant\u00a0and Exterior Heating Network<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan USAF Compound<\/strong> (USAF, GEMAS Co. Inc.)<\/p>\n\n\n\n<p>&#8211; ACCOM &amp; CIS Buildings<br>&#8211; Warehouses 1-2-3-4<br>&#8211; Admin Building<br>&#8211; Guard House<br>&#8211; Pump House<br>&#8211; H-Diesel Generator<br>&#8211; MDP-synpanel &amp; fuel tank<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan COMKAF HQ Office Accommodations <\/strong>(FEM JV-GEMAS) &#8211; Kilo Hangar East &amp; West Wings<br>&#8211; BOC Building Renovation<br>&#8211; New COMCAF HQ Building<br>&#8211; TLS Building Renovation<br>&#8211; Hangar<br>&#8211; Container Park<\/p>\n\n\n\n<p><strong>Protection and Sustainable Development of Natural Resources and Biodiversity in Kirklareli Yildiz Mountains of Turkiye <\/strong>(UNESCO)<\/p>\n\n\n\n<p><strong>Adana Incirlik Air Base Mix Use Facility <\/strong>(NATO) <strong><br>&#8211; <\/strong>Security Police Operations Bldg.<br>&#8211; Fuels Laboratory<br>&#8211; New Gymnasium<br>&#8211; Radar Transmitter Building<br>&#8211; Medical Warehouse<br>&#8211; Field Support buildings (NATO)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SelcukUniversitesi\/SelcukUniversitesi.htm\"><strong>Konya SELCUK UNIVERSITY\u00a0<\/strong><\/a>(Total : 200.000 sq.m.)<br>&#8211; Faculty of Science, 60.000 sq.m.\u00a0<br>&#8211; Faculty of Literature, 25.000 sq.m.\u00a0<br>&#8211; Presidential Bldg.\u00a0<br>&#8211; Medico-Social Center\u00a0<br>&#8211; Computer Center\u00a0<br>&#8211; Printing House\u00a0<br>&#8211; Library Bldg.\u00a0<br>&#8211; Cafeteria Bldg.\u00a0<br>&#8211; Guest House<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kadikoy-governmental-complex\/\" data-type=\"post\" data-id=\"131\">Istanbul Kadikoy Governmental Complex<\/a> ,<\/strong> 43.000 sq.m. (Ministry of Public Works)<\/p>\n\n\n\n<p><strong>RYAD<\/strong> <strong>Farmhouses Complex, <\/strong>Saudi Arabia (Private client)<\/p>\n\n\n\n<p><strong>Konya ILGIN Power Plant &amp; Coal Mines Admin. &amp; Technical\u00a0\u00a0 Bldg.&#8217;s Complex <\/strong>12.000 sq.m. (Konya Ilgin Electric Production B.V.\u00a0\u2013 USA) \u00a0\u00a0<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/BilkentOtel\/BilkentOtel.htm\"><strong>Ankara BILKENT\u00a0Conference Center, multi-Purpose Hall (1000 pax), Additional 5 Star Hotel\u00a0&amp; Renovation of Existing 4 Star Hotel<\/strong><\/a><strong>,\u00a0<\/strong>19.000 sq.m. (Bilintur Co. Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/LutfiKirdar\/LutfiKirdarWeb.htm\"><strong>Istanbul LUTFI KIRDAR International Conference Center, Additional\u00a0<br>multi- Purpose\u00a0(2000 pax) and Exhibition (2000 pax) Halls Bldg.<\/strong><\/a>13.750 sq.m.(UKTAS Co.Inc.) \u00a0<\/p>\n\n\n\n<p><strong>Ankara GIMAT Dry Food Wholesalers&#8217; Compound<\/strong>, 360 shops (Tech. Consultancy Services)<\/p>\n\n\n\n<p><strong>Istanbul SABIHA GOKCEN\u00a0 AIRPORT <\/strong>(1999 NATO Project,later civilian airport) <strong>\u00a0\u00a0<br><\/strong>(total of 37.460 sq.m. 1999)<br>&#8211; Domestic Flights Terminal Bldg., 4.000 sq.m.<br>&#8211; Cargo Bldg., 6.000 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Security Bldg., 1.800 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Guest House, 1.500 sq.m.\u00a0\u00a0<br>&#8211; Police Security Bldg., 4.700 sq.m.<br>&#8211; Vehicle Maintenance Workshop, 4.000 sq.m.\u00a0\u00a0<br>&#8211; Private Companies&#8217; Services Bldg., 4.760 sq.m.\u00a0\u00a0<br>&#8211; Customs Bldg., 1.650 sq.m.\u00a0\u00a0<br>&#8211; Accident-Fire, Fire Brigade Bldg., 4.050 sq.m.\u00a0\u00a0<br>&#8211; Lodgings, 50 houses<\/p>\n\n\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound \u00a0<br><\/strong>&#8211; Workers&#8217; Houses, 850 ea.<br>&#8211; Turkish Bath, 630 sq.m.\u00a0<br>&#8211; Sports Hall (closed), 3.300 sq.m. \u00a0<br>&#8211; Cinema, 1.130 sq.m.<br>&#8211; Shopping Center, 1.200 sq.m.<br>&#8211; First Aid Bldg., 900 sq.m.<br>&#8211; Workers&#8217; Dormitory, 10.400 sq.m.<br>&#8211; Technical High School, 13.600 sq.m.<br>&#8211; High School, 1.600 sq.m.<br>&#8211; Elementary School, 1.600 sq.m.<br>&#8211; Nursing School, 960 sq.m.<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KemerYatLimani\/KemerYatLimani.htm\"><strong>Antalya\/Kemer Marina\u00a0Facilities<\/strong><\/a><strong>,<\/strong>\u00a020.500 sq.m. (total) (State Tourism Bank) <\/p>\n\n\n\n<p><strong>State Electricity Institution Buildings (TEK)<br><\/strong>&#8211; Kahramanmaras Management Center<br>&#8211; Kahramanmaras Cafeteria, Guest House and Admin. Bldg.<br>&#8211; Yenikoy Power Plant Recreational Bldg.<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-7-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Business Centers<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-7-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7.jpeg\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>\u201cMERKEZ ANKARA\u201d Mix Use Complex<\/strong><br><\/a>GEN-TES provided Mechanical Engineering Design Consultancy Services<br>(HVAC, Sanitary and Fire Fighting designs) during the Concept and Preliminary Design phases of the Complex.<br> <strong>Features:<br><\/strong>&#8211; Residential, office, retail and other functions on a single large parcel of 125.000 sq.m. Total construction area: 1,185,015 sq.m.<br>&#8211; Residential components, with 1578 units divided into different types and blocks, each with variations in apartment sizes.<br>&#8211; Commercial\/Office towers with parking and open spaces. Pasific Tower (Flagship Skyscraper, 66 floors, 300 m. high), Collective Office Tower\u00a0 and Terrace Office Tower &#8211; serving as office complexes.<br>&#8211; Retail-Commercial Zone (a 600 m. long open-air shopping street\/retail avenue with about 150 shops in its retail corridor)<br>&#8211; Offices (total of varying between 1425-1500 offices)<br>&#8211; Residential and mix-use blocks\u00a0 (Residential Block: 38 floors)<br>&#8211; Smaller City Suites and Villas<br>&#8211; Various social facilities, landscaped open areas and plazas, shared courtyards and gardens.<br>(Construction of some buildings, such as apartment houses-villas, hotels and some shopping areas continue in the year 2025)<\/p>\n\n\n\n<p><strong>Istanbul BAYRAMPASA Wholesale Market,\u00a0<\/strong>100.000 sq.m. (Istanbul Municipality)\u00a0<\/p>\n\n\n\n<p><strong>Ankara 300 Business Units (<\/strong>Ankara Commerce Stock Exchange)(Complete Consultancy)\u00a0\u00a0<\/p>\n\n\n\n<p><strong>SMOLENSKAYA Housing &amp; Business Center &#8211; <\/strong>Moscow\/Russia (Sibtek\u00a0Co. Inc.)<\/p>\n\n\n\n<p><strong>MOSCOW Business Center &#8211; <\/strong>Russia, 11.000 sq.m. (Sibtek Co. Inc.)\u00a0 <\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/istanbul-kaplancali-business-center\/\" data-type=\"post\" data-id=\"173\">Istanbul Kaplancali Business Center<\/a><\/strong>, 4.500 sq.m. (Klima Co. Inc.)<\/p>\n\n\n\n<p><strong>Ankara GIMAT Dry Food Wholesalers&#8217; Compound<\/strong>, 360 shops (Tech. Consultancy Services)<\/p>\n\n\n\n<p><strong>Artvin Business Center and Nursing Home<\/strong> (Private client)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-8-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Central Heating Plants, Exterior Networks,<br>Wastewater Treatment Plants and Energy Plants<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-8-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>Diyarbakir Kralkizi Dam<\/strong>\u00a0(DSI State Hydraulic Works Inst.)<br>Heating Plant &amp; Exterior Network<\/p>\n\n\n\n<p><strong>Aydin\/Didim Wastewater Treatment Plant <\/strong>(Didim Municipality)- Admin. Bldg.<br>&#8211; Security Bldg.<br>&#8211; Chlorination Bldg.\u00a0<br>&#8211; Water Elimination Bldg.\u00a0<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Wastewater Treatment Plant<br><\/strong>Administration and Security Buildings (Marmaris Municipality)\u00a0<\/p>\n\n\n\n<p><strong>Norwaste Waste-to-Energy Plants\u00a0&#8211; <\/strong>Technical Consultancy and Representation\u00a0for Plants\u00a0in\u00a0Turkiye\u00a0(Norwaste\/Norway)<\/p>\n\n\n\n<p><strong>Gunal\u00a0 Co.Inc.\u00a0MNG Ankara Industrial Compound <\/strong>(MNG Holding)<br>&#8211; Wooden Workshop<br>&#8211; Steel Workshop<br>&#8211; Admin. Bldg.<br>&#8211; Central Heating Plant<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-9-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Airport Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-9-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kaia-north-relocation-kabul-afghanistan-facilities\/\" data-type=\"post\" data-id=\"139\">Kaia North Relocation Kabul\/Afghanistan Facilities<\/a> <\/strong>(NAMSA-NATO Europe)<br>&#8211; HQ Main and AOC\/Force Protection\/AIS-FSO Bldg.<br><strong>&#8211; <\/strong>Passenger Terminal (PRC)<br>&#8211; Cargo Office and Cargo Tents<br>&#8211; Helicopter Hangar<br>&#8211; CIS Building<br>&#8211; Workshop\/Supply Building<br>&#8211; Camp Facilities Maintenance Building<br>&#8211; Dog Kennel<br>&#8211; Fuel Station and Car Wash<br>&#8211; Solid Garbage Treatment Plant<br>&#8211; Accommodations Buildings Type A, B and C<br>&#8211; MWA\/Gymnasium<br>&#8211; Laundry Building<br>&#8211; Dining Hall and Main Kitchen<br><strong>&#8211; <\/strong>Meteorology Building<br>&#8211; Follow-me &amp; SNIC Building<\/p>\n\n\n\n<p><strong>Kandahar-Afghanistan COMKAF HQ Office Accommodations <\/strong>(FEM JV-GEMAS) &#8211; Kilo Hangar East &amp; West Wings<br>&#8211; BOC Building Renovation<br>&#8211; New COMCAF HQ Building<br>&#8211; TLS Building Renovation<br>&#8211; Hangar<br>&#8211; Container Park<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/sanliurfa-gap-airport-terminal\/\" data-type=\"post\" data-id=\"141\">Sanliurfa GAP Airport Terminal<\/a><\/strong>, 3.500 sq.m., (Under ODTM) (GAP &amp; DLH)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/q-west-iraq-theater-transportation-mission-area-buildings\/\" data-type=\"post\" data-id=\"134\">Q-West\/IRAQ Theater Transportation Mission Area Buildings<\/a> <\/strong>(US Army Corps of Engineers) (Design-Build project, design undertaken by GEN-TES)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base &#8211; Trailer-Truck Aircraft Facility <\/strong>(NATO)<br>&#8211; Electronics Workshop &amp; Field Support Workshop Bldgs.<br>&#8211; Maintenance Commandership Headquarters<br>&#8211; BEM\/GBE Commandership Bldg.<br>&#8211; Parachute Center<br>&#8211; Chargery<br>&#8211; Production Workshop Line<br>&#8211; Maintenance Bldg.<br>&#8211; Supply Storage Bldg.<br>&#8211; Central Heating Plant &amp; Exterior Heating Network<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base Avionics Facility<\/strong> (NATO + USAF)<\/p>\n\n\n\n<p><strong>Niger Air Base 201 Compound Near Agades, <\/strong>total\u00a0\u00a0 area of 25 sq. kilometers (25,000,000 sq.m.) (Also called \u2018USAF Compound\u2019) (USAF &amp; GEMAS Co. Inc.)<br>&#8211; Aircraft Support Facilities<br>&#8211; Base Camp and Support Buildings<br>&#8211; Living Quarters and Personnel Facilities<br>&#8211; Base Roads and Utilities<br>&#8211; Perimeter Fence and Guard Towers<br>&#8211; Fuel Storage and Maintenance Areas<br>&#8211; Life Support and Logistical Facilities<br>&#8211; Training and Operations Buildings<br>&#8211; Aircraft Hangars<\/p>\n\n\n\n<p><strong>Istanbul SABIHA GOKCEN\u00a0<\/strong>(NATO 1999 &amp; later Civilian)<strong>Airport<\/strong> (total 37.460 sq.m.)<br>&#8211; Domestic Flights Terminal Bldg., 4.000 sq.m.<br>&#8211; Cargo Bldg., 6.000 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Security Bldg., 1.800 sq.m.\u00a0\u00a0<br>&#8211; Gendarme Guest House, 1.500 sq.m.\u00a0\u00a0<br>&#8211; Police Security Bldg., 4.700 sq.m.<br>&#8211; Vehicle Maintenance Workshop, 4.000 sq.m.\u00a0\u00a0<br>&#8211; Private Companies\u2019 Services Bldg., 4.760 sq.m.\u00a0\u00a0<br>&#8211; Customs Bldg., 1.650 sq.m.\u00a0\u00a0<br>&#8211; Accident-Fire, Fire Brigade Bldg., 4.050 sq.m.\u00a0\u00a0<br>&#8211; Lodgings, 50 houses<\/p>\n\n\n\n<p><strong>Ankara and Izmir International Airport Terminals Arch. &amp; Eng.<\/strong> <strong>Design Competition <\/strong>(Mech. Concept Design &amp; Report, 2nd award for Ankara International Airport ) (Under mother company ODTM)<\/p>\n\n\n\n<p><strong>16th JET Air Base\u00a0Aircraft Maintenance Hangar\u00a0<\/strong>(Ministry of Defense)<\/p>\n\n\n\n<p><strong>Ankara MURTED Air Base Protected Avionics Workshop<\/strong><\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-10-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Monumental, Cultural, Arts Buildings and Conference Centers<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-10-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir.jpg\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Ankara ANITKABIR (Ataturk&#8217;s Mousoleum) Heating &amp;\u00a0Ventilation System<\/strong> <strong>Design<\/strong><\/a>\u00a0(Turkish Armed Forces Gen. Staff Headquarters &amp; Contractor Haydar Sanli)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/LutfiKirdar\/LutfiKirdarWeb.htm\"><strong>Istanbul LUTFI KIRDAR International Conference Center, Additional\u00a0<br>multi- Purpose\u00a0(2000 pax) and Exhibition (2000 pax) Halls Bldg.<\/strong><\/a>13.750 sq.m.(UKTAS Co.Inc.) <\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SheratonKongre\/SHERATON.htm\"><strong>Ankara SHERATON\u00a0 Conference &amp; Culture Center and\u00a0&#8216;Luxury Collection&#8217; Hotel<\/strong><\/a> 35.000 sq.m. (NUROL-TURSER)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/BilkentOtel\/BilkentOtel.htm\"><strong>Ankara BILKENT\u00a0Multi-Purpose Hall (1000 pax), Additional 5 Star Hotel\u00a0&amp; Renovation of Existing 4 Star Hotel<\/strong><\/a><strong>,\u00a0Conference Center, <\/strong>19.000 sq.m. (Bilintur Co. Inc.)<strong>\u00a0<\/strong><\/p>\n\n\n\n<p><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia \u00a0(Preliminary Mechanical Design) 80.000 sq.m.(MIR)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-11-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Educational Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-11-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound<br><\/strong>&#8211; Technical High School, 13.600 sq.m.<br>&#8211; High School, 1.600 sq.m.<br>&#8211; Elementary School, 1.600 sq.m.<br>&#8211; Nursing School, 960 sq.m.\u00a0<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SelcukUniversitesi\/SelcukUniversitesi.htm\"><strong>Konya SELCUK UNIVERSITY\u00a0<\/strong><\/a>(Total: 200.000 sq.m.)\u00a0\u00a0\u00a0\u00a0<\/p>\n\n\n\n<p>&#8211; Faculty of Science<br>&#8211; Faculty of Literature\u00a0<br>&#8211; Presidential Bldg.\u00a0<br>&#8211; Medico-Social Center\u00a0<br>&#8211; Computer Center\u00a0<br>&#8211; Printing House\u00a0<br>&#8211; Library Bldg.\u00a0<br>&#8211; Cafeteria Bldg.\u00a0<br>&#8211; Guest House<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/SelcukUniversitesi\/SelcukUniversitesi.htm\"><strong>Konya SELCUK UNIVERSITY,\u00a0Faculty of Medical Sciences &amp; Hospital<\/strong><\/a> <br>90.000 sq.m.\u00a0<\/p>\n\n\n\n<p><strong>Complete Consultancy for 57 Elementary Schools in 22 Provinces of Turkiye<br><\/strong>(Design &amp; construction supervision services under the mother company ODTM)(Ministry of Education)<\/p>\n\n\n\n<p><strong>AIBU Abant Izzet Baysal Univ Bolu Campus,\u00a0Faculty of\u00a0Electrics &amp; Electronics Engineering Buildings,<\/strong> 10.500\u00a0sq.m.<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AIBUDuzceTip\/TipMorfoloji.htm\"><strong>AIBU Duzce Campus &#8211; Faculty of Medicine<\/strong><\/a>, 33.000 sq.m.<br>(Abant Izzet Baysal University)<\/p>\n\n\n\n<p><strong>BILKENT\u00a0 East Campus Ankara Prep. School Bldg.\u00a0<\/strong>7.000 sq.m.\u00a0(Bilkent University)<\/p>\n\n\n\n<p><strong>Ankara GOKKUSAGI Compound &#8211; Nursing School<\/strong>\u00a0(Bayindir Co.Inc.)<\/p>\n\n\n\n<p><strong>Renovation of Adana Incirlik Library Building <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Mersin Muhittin Develi Primary School Building <\/strong>(Ministry of Education)<\/p>\n\n\n\n<p><strong>Ankara Golbasi Elementary School Bldg. (<\/strong>TEKState Electricity Institution)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-tek-cayirhan-mosque\/\" data-type=\"post\" data-id=\"159\">Ankara TEK Cayirhan Mosque<\/a><\/strong> (MNG Inc.)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-12-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Industrial Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-12-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>NOVOKUZNETSK\/Siberia\u00a0Bread Factory <\/strong>(Petkontur &amp;Zapsib Steel Factory, Russia)<\/p>\n\n\n\n<p><strong>NOVOKUZNETSK\/Siberia\u00a0Brewery <\/strong>(Petkontur &amp;Zapsib Steel Factory, Russia)<\/p>\n\n\n\n<p><strong>WESTINGHOUSE Ankara Electronics Factory<\/strong> (Preliminary Mechanical Design \u2013\u00a0WESSA)<\/p>\n\n\n\n<p><strong>Ankara MACUNKOY Bread Factories\u00a0(2)<\/strong>,<strong> <\/strong>6.000 sq.m.+1.650sq.m.\u00a0 (Ankara Municipality)<\/p>\n\n\n\n<p><strong>Aydin\/Cine CAG-KOOP Meat Processing Facility<\/strong>, 5.000 sq.m\u00a0\u00a0(Cag-Koop.)<br>(Mech.Eng.preliminary design)<\/p>\n\n\n\n<p><strong>Istanbul\u00a0CAYKUR<\/strong>\u00a0<strong>Buyukdere Tea Packing Factory<\/strong>,11.500 sq.m.<br>(Ministry of Customs and Monopolies)<\/p>\n\n\n\n<p><strong>Kirsehir\/CEMAS\u00a0 Steel &amp; Steel Products Factory &#8211; Laboratories Bldg. and Cooling Water Facility\u00a0<\/strong>(Private client)<\/p>\n\n\n\n<p><strong>Konya ILGIN Electric Production Facilities<\/strong> (B.V. USA)<\/p>\n\n\n\n<p><strong>Erzurum\/Kargapazari Air Defense Radar Facilities<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Kayseri Wooden Works Industrial Compound and Brickett Drying Facility<\/strong>\u00a0<br>(Private client)<\/p>\n\n\n\n<p><strong>Aydin\/Didim Wastewater Treatment Plant <\/strong>(Didim Municipality)<br>&#8211; Admin. Bldg.<br>&#8211; Security Bldg.<br>&#8211; Chlorination Bldg.\u00a0<br>&#8211; Water Elimination Bldg.<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Wastewater Treatment Plant, Administration and Security Buildings<\/strong> (Marmaris Municipality)\u00a0<\/p>\n\n\n\n<p><strong>Balikesir NATO Air Base\u00a0Maintenance Workshops <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Ankara Elmadag Radar Facilities <\/strong>(NATO)<\/p>\n\n\n\n<p><strong>Gunal\u00a0Co.Inc.\u00a0MNG Ankara Industrial Compound <\/strong>(MNG Holding)<br>&#8211; Wooden Workshop<br>&#8211; Steel Workshop<br>&#8211; Admin. Bldg.<br>&#8211; Central Heating Plant<\/p>\n\n\n\n<p><strong>Balikesir Air Base Fuel Distribution Facility\u00a0<\/strong>(NATO +\u00a0USAF)<\/p>\n\n\n\n<p><strong>Diyarbakir Kralkizi Dam &#8211; Power Plant\u00a0Bldg. <\/strong>(DSI-State Hydraulic Works Inst.)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline Station\u00a0<\/strong>\u00a0\u00a0<br>(AAFES, Zirndorf &#8211; GERMANY)<\/p>\n\n\n\n<p><strong>Ankara Elmadag Radar Facilities<\/strong><\/p>\n\n\n\n<p><strong>Kirsehir\/CEMAS Steel &amp; Steel Products Factory<\/strong> &#8211; Laboratories Bldg. and Cooling Water Facility (Private client)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-13-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Laboratories<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-13-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/UME\/ume.htm\"><strong>TUBITAK Gebze Campus\u00a0UME New Metrology Laboratories Complex<\/strong><\/a> 24.400 sq.m.\u00a0 (UME National Metrology Institute) <\/p>\n\n\n\n<p><strong>METU (Middle East Technical University) Gaziantep Campus<br><\/strong>Electrical- Electronics Engineering Laboratories Bldg, 1.100 sq.m.<\/p>\n\n\n\n<p><strong>Ankara BILKENT University Molecular Biology Laboratories, Animal House\u00a0 and Gene Research Facility<\/strong>,\u00a06,500 sq.m. (Bilkent University)<\/p>\n\n\n\n<p><strong>Kirsehir\/CEMAS\u00a0 Steel &amp; Steel Products Factory &#8211; Laboratories Bldg. and Cooling Water Facility\u00a0<\/strong>(Private client)<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-14-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Military Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-14-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/anitkabir.jpg\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Ankara ANITKABIR (Ataturk&#8217;s Mousoleum) Heating &amp;\u00a0Ventilation System<\/strong> <strong>Design<\/strong><\/a>\u00a0(Turkish Armed Forces Gen. Staff Headquarters &amp; Contractor Haydar Sanli)<br><br><strong>State Naval\u00a0 Forces of Turkiye <\/strong>(Ministry of Defense)<br>&#8211; Izmir Foca Shooting Polygon, 3.000 sq.m.\u00a0<br>&#8211; Zonguldak\/Eregli Military Guest House, 2.500 sq.m.<br>&#8211; Istanbul Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Izmir Foca Amphibious Landing Squadron Ops. Headquarters, 1.500 sq.m.<br>&#8211; Izmir Underwater Duty Group Headquarters, 1.500 sq.m.\u00a0<br>&#8211; Ankara Elmadag Barracks, 500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound &#8211; Kitchen &amp; Cafeteria, 1.300 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound- Nursing House, 1.500 sq.m.\u00a0<br>&#8211; Izmir Turan Sewing Compound Central Heating Plant\u00a0<br>&#8211; Izmir Yolluca Island Military Lodgings, Central Heating Plant\u00a0and Exterior Heating \u00a0\u00a0\u00a0Network<\/p>\n\n\n\n<p><strong>Three\u00a0Squadron Operations + Wing Operations\u00a0 and Three Squadron Operations Buildings <\/strong>with CBR shelters\u00a0at different provinces of Turkiye (NATO + USAF)<strong>\u00a0 <\/strong>(CBR = Military shelters protected against chemical, biological and nuclear attacks)<\/p>\n\n\n\n<p><strong>Niger Air Base 201 Compound Near Agades, <\/strong>total\u00a0\u00a0 area of 25 sq. kilometers (25,000,000 sq.m.) (Also called \u2018USAF Compound\u2019) (USAF &amp; GEMAS Co. Inc.)<br>&#8211; Aircraft Support Facilities<br>&#8211; Base Camp and Support Buildings<br>&#8211; Living Quarters and Personnel Facilities<br>&#8211; Base Roads and Utilities<br>&#8211; Perimeter Fence and Guard Towers<br>&#8211; Fuel Storage and Maintenance Areas<br>&#8211; Life Support and Logistical Facilities<br>&#8211; Training and Operations Buildings<br>&#8211; Aircraft Hangars &#8211; Barracks<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/kaia-north-relocation-kabul-afghanistan-facilities\/\" data-type=\"post\" data-id=\"139\">Kaia North Relocation Kabul\/Afghanistan Facilities<\/a> <\/strong>(NAMSA-NATO Europe<br>&#8211; HQ Main and AOC\/Force Protection\/AIS-FSO Bldg.<br>&#8211; Passenger Terminal (PRC)<br>&#8211; Cargo Office and Cargo Tents<br>&#8211; Helicopter Hangar<br>&#8211; CIS Building<br>&#8211; Workshop\/Supply Building<br>&#8211; Camp Facilities Maintenance Building<br>&#8211; Dog Kennel<br>&#8211; Fuel Station and Car Wash<br>&#8211; Solid Garbage Treatment Plant<br>&#8211; Accommodations Buildings Type A, B and C<br>&#8211; MWA\/Gymnasium<br>&#8211; Laundry Building<br>&#8211; Dining Hall and Main Kitchen<br><strong>&#8211; <\/strong>Meteorology Building- Follow-me Building<br>&#8211; SNIC Building<\/p>\n\n\n\n<p><strong>Adana-Incirlik\u00a0NATO\u00a0Air Base Security Battalion Commandership Bldg.<br><\/strong>4.000 sq.m.(NATO)<\/p>\n\n\n\n<p><strong>IZMIR Military Operations Building<\/strong> (NATO)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/q-west-iraq-theater-transportation-mission-area-buildings\/\" data-type=\"post\" data-id=\"134\">Q-West\/IRAQ Theater Transportation Mission Area Buildings<\/a> <\/strong>(US Army Corps of Engineers) (Design-Build project, design undertaken by GEN-TES)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\">Adana Incirlik Air Base Family Eagle Housing<\/a><\/strong>, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<\/p>\n\n\n\n<p><strong>Adana\/Incirlik Air Base VSF (Vault Support Facility) <\/strong>(USAF) (GEMAS Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/ankara-etimesgut-military-hospital-renovation\/\" data-type=\"post\" data-id=\"144\">Ankara Etimesgut Military Hospital Renovation of Operation Theaters and Intensive Care Unit<\/a>, <\/strong>Etimesgut Military Hospital \u00a0<\/p>\n\n\n\n<p><strong>Erzurum\/Kargapazari Air Defense Radar Facilities<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Pirinclik\/Diyarbakir NATO Radar Base\u00a0Security\u00a0Bldg. <\/strong>(USAF)<\/p>\n\n\n\n<p><strong>Ankara Murted NATO Air Base Guest House\u00a0\u00a0<\/strong>(NATO) <\/p>\n\n\n\n<p><strong>Ankara Murted NATO Air Base Avionics Workshop <\/strong>(NATO)<\/p>\n\n\n\n<p><strong>Ankara Murted Air Base &#8211; Protected Avionics Workshop for F1-16s.<\/strong> (NATO)<\/p>\n\n\n\n<p><strong>Balikesir\u00a0NATO Air Base Admin. Bldg. <\/strong>(NATO + USAF)<\/p>\n\n\n\n<p><strong>Balikesir Air Base Fuel Distribution Facility\u00a0<\/strong>(NATO +\u00a0USAF)<\/p>\n\n\n\n<p><strong>16th JET Air Base-\u00a0Ankara Aircraft Maintenance Hangar\u00a0<\/strong>(Ministry of Defense)<\/p>\n\n\n\n<p><strong>Erzurum Military Guest House<\/strong>,\u00a02.500 sq.m. (Ministry of Defense)<\/p>\n\n\n\n<p><strong>Adana Incirlik NATO Air Base Post Office Bldg.\u00a0(<\/strong>USAF)<\/p>\n\n\n\n<p><strong>Adana-Incirlik\u00a0NATO\u00a0Air Base Security Battalion Commandership Bldg.<br><\/strong>4.000 sq.m.(NATO)<\/p>\n\n\n\n<p><strong>Ankara Cankaya Gendarme School Commandership,\u00a0 Social Facilities &amp; Lodgings\u00a0(<\/strong>Ministry of Public Works)\u00a0<\/p>\n\n\n\n<p><strong>AAFES Adana-Incirlik NATO Air Base Electronics Sales Shop<br><\/strong>(AAFES, Zirndorf \/ Germany)\u00a0 \u00a0\u00a0<\/p>\n\n\n\n<p><strong>Three Social Facilities in Adana, Balikesir and\u00a0 Elmadag\u00a0 for Air\/Radar Bases <\/strong>(NATO +USAF)<\/p>\n\n\n\n<p><strong>Incirlik NATO Air Base, AAFES Shopette &amp; Gasoline\u00a0 Station\u00a0<\/strong>\u00a0\u00a0<br>(AAFES, Zirndorf &#8211; GERMANY\u00a0<\/p>\n\n\n\n<p><strong>Adana Incirlik NATO Air Base Guest House\u00a0<\/strong>(NATO + USAF BCE)<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><a id=\"_msocom_1\"><\/a><\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-15-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Shopping Centers<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-15-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AdanaGalleria\/galleria_web.htm\"><strong>Adana GALLERIA Shopping Center<\/strong><\/a>, 65.000 sq.m. (Anakent Co.Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AAFESPX\/AAFES_PX_web.htm\"><strong>Adana\/Incirlik NATO Air Base AAFES PX (BX) Shopping Center<\/strong><\/a><\/p>\n\n\n\n<p><strong>ILYINKA\/Siberia Shopping Center<\/strong> Russia,1.800 sq.m. (Sibtek Co. Inc.)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/diyarbakir-underground-shopping-mall\/\" data-type=\"post\" data-id=\"165\">Diyarbakir Underground Shopping Mall<\/a>, <\/strong>100 shops (Diyarbakir Municipality)<\/p>\n\n\n\n<p><strong>AAFES Adana-Incirlik NATO Air Base Electronics Sales Shop<br><\/strong>(AAFES, Zirndorf \/ Germany)\u00a0<\/p>\n\n\n\n<p><strong>Tokat Sumerbank Shopping Hall &amp; Lodging House,<\/strong>\u00a0 2.000 sq.m.<br>(Sumerbank Gen. Directorate)<\/p>\n\n\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound<br><\/strong>&#8211; Cinema, 1.130 sq.m.<br>&#8211; Shopping Center, 1.200 sq.m.<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline\u00a0 Station\u00a0<\/strong>\u00a0\u00a0<br>(AAFES, Zirndorf &#8211; GERMANY\u00a0<\/p>\n\n\n\n<p><strong>Adana\/Incirlik AAFES Air Base Electronics Sales Shop<\/strong>\u00a0 (USAF)<br>(AAFES, Zirndorf \u2013 GERMANY<\/p>\n\n\n\n<p><strong>Ankara GIMAT Dry Food Wholesalers&#8217; Compound<\/strong>, 360 shops<br>(Tech. Consultancy Services ) \u00a0<\/p>\n\n\n\n<p><strong>Istanbul BAYRAMPASA Wholesale Market,\u00a0<\/strong>100.000 sq.m.<br>(Istanbul Municipality)<\/p>\n\n\n\n<p><strong>Ankara GIMAT Dry Food Wholesalers&#8217; Compound<\/strong>, 360 shops<br>(Tech. Consultancy Services)\u00a0<\/p>\n\n\n\n<p><strong>Adana\/Incirlik NATO Air Base AAFES Shopette &amp; Gasoline Station<\/strong> (AAFES, Zirndorf &#8211; GERMANY<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-16-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Social &amp; Recreational Facilities<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-16-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\"><strong>Adana Incirlik Air Base Family Eagle Housing<\/strong><\/a>, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<a id=\"_msocom_1\"><\/a><\/p>\n\n\n\n<p><strong>Adana\/Incirlik New Family Services Center <\/strong>(USAF) <\/p>\n\n\n\n<p><strong>ANAPA\/Russia Social Facilities &amp; Mass Houses (<\/strong>KLIMA Co. Inc.)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/TEKLokal\/Lokal.htm\"><strong>TEK Ankara Golbasi Recreational Bldg.<\/strong><\/a> <strong>&amp; Social Facility<\/strong> 4.500 sq.m.<br>(State Electricity Inst.) <\/p>\n\n\n\n<p><strong>Ankara DIKMEN VALLEY Project &#8211; Cafeteria Bldg. and Recreational Areas<\/strong><br>(Ankara Metropolitan Municipality, METROPOL Co.Inc).<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>Izmir\u2013Selcuk PAMUCAK Aqua Fantasy Touristic Facilities<\/strong><\/a><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>\u00a0<\/strong><\/a>(Buyuk Co. Inc.)<strong> (<\/strong>hyperlink provided)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/TPAOBatman\/TPAOBatman.htm\"><strong>TPAO Batman Recreational Facility and Guest House<\/strong><\/a><strong>,\u00a0<\/strong>3.500 sq.m.<br>Turkish Petroleum Works Co.Inc\u00a0 (Design &amp; constr. supervision)<\/p>\n\n\n\n<p><strong>Mugla\/Koycegiz Iztuzu Lake Recreational Facilities (<\/strong>State Tourism Bank)<\/p>\n\n\n\n<p><strong>Ankara\/Kecioren Revolving Tower &amp; Restaurant<\/strong>, 1.500 sq.m.<br>(Kecioren Municipality)<\/p>\n\n\n\n<p><strong>Istanbul\/Umraniye CINEMAXX Cinema Halls Bldg.<\/strong> (Eight Halls)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KemerYatLimani\/KemerYatLimani.htm\"><strong>Antalya\/Kemer Marina\u00a0Facilities<\/strong><\/a><strong>,<\/strong>\u00a020.500 sq.m. (total)<br>(State Tourism Bank) <\/p>\n\n\n\n<p><strong>Diyarbakir Kralkizi Dam<\/strong>\u00a0(DSI State Hydraulic Works Inst.)<br>&#8211; Recreational\u00a0Bldg.<\/p>\n\n\n\n<p><strong>METU Graduates&#8217; Assoc. Ankara Recreational Facility and Closed Swimming Pool<\/strong>\u00a0\u00a0(Middle East Technical University)<\/p>\n\n\n\n<p><strong>Ankara ERYAMAN Mass Housing Compound &#8211; Social Facilities<\/strong><br>(Total of 12.000 sq.m.)<br>&#8211; Tennis Club<br>&#8211; Restaurant<br>&#8211; Greenhouses<br>&#8211; Garden\u00a0Cafe\u00a0<br>&#8211; Closed Swimming Pool<br>&#8211; Admin Bldg.<br>&#8211; Health Clinics<\/p>\n\n\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound<\/strong><\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/batman-guest-house-social-facilities\/\" data-type=\"post\" data-id=\"150\">Batman Guest House\u00a0 &amp; Social Facilities<\/a><\/strong>,\u00a0 3.500 sq.m. TPAO\u00a0 Gen. Directorate of Turkish Petrolium\u00a0\u00a0 Co. Inc.<\/p>\n\n\n\n<p><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia(Preliminary Mechanical Design)80.000 sq.m.(MIR)<\/p>\n\n\n\n<p><strong>State Electricity Institution (TEK)<\/strong><br>&#8211; Yenikoy Power Plant Recreational Bldg.<\/p>\n\n\n\n<p><strong>Ankara ALTINPARK Facilities<br>&#8211; <\/strong>Closed Olympic Swimming Pool<br>&#8211; Presidential Bldg.<br>-Greenhouses and Stables<strong>\u00a0<br>(<\/strong>Ankara Metropolitan Municipality) (Design and constr. supervision)<\/p>\n\n\n\n<p><strong>Three Social Facilities in Adana, Balikesir and\u00a0Ankara\/Elmadag\u00a0 for Air\/Radar Bases <\/strong>(NATO +USAF)<\/p>\n\n\n\n<p><strong>Ankara Cankaya Gendarme School Commandership,\u00a0 Social Facilities &amp; Lodgings\u00a0(<\/strong>Ministry of Public Works)\u00a0<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-17-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Sports Facilities, Swimming Pools, Baths and Ponds<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-17-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong>YALTA Health, Social, Cultural\u00a0and Sports Complex &#8211;<\/strong>Russia(Preliminary Mechanical Design)80.000 sq.m.(MIR)<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/reference\/adana-incirlik-air-base-family-eagle-housing\/\" data-type=\"post\" data-id=\"176\">Adana Incirlik Air Base Family Eagle Housing<\/a><\/strong>, 100 villas for high-ranking US Military Officers (USAF-EUDED Wiesbaden Germany) (MAKYAL-GEMAS)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>Izmir\u2013Selcuk PAMUCAK Aqua Fantasy Touristic Facilities<\/strong><\/a><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/AquaFantasy\/SelcukAquapark.htm\"><strong>\u00a0<\/strong><\/a>(Buyuk Co. Inc.)<strong> <\/strong><\/p>\n\n\n\n<p><strong>Renovation of Ankara\/Balgat Sports Halls<\/strong> (USAF)<\/p>\n\n\n\n<p><strong>Renovation of Adana\/Incirlik Sports Hall<\/strong> (USAF)<\/p>\n\n\n\n<p><strong>Kahramanmaras\/Afsin Elbistan State Coal Mine Instutition Compound<br><\/strong>&#8211; Sports Hall (closed), 3.300 sq.m.<br>&#8211; Turkish Bath, 630 sq.m.\u00a0<\/p>\n\n\n\n<p><strong>TEK Ankara Golbasi Olympic Swimming Pool &amp;\u00a0Sports Hall<\/strong> (State Electricity Institution)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris AMAZON Camping Facilities and swimming pool (<\/strong>Private\u00a0client) (Design + site supervision)<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris Muhammed Tolon Hotel &amp; Swimming Pool<\/strong>, 3 stars, 60 beds<br>(Design + site supervision) (Private client)\u00a0<\/p>\n\n\n\n<p><strong>Ankara ERYAMAN Mass Housing Compound \u00a0<\/strong><br>&#8211; Closed Swimming Pool<br>&#8211; Sports Hall<\/p>\n\n\n\n<p><strong>Ankara ALTINPARK Facilities<br>&#8211; <\/strong>Closed Olympic Swimming Pool<br>&#8211; Presidential Bldg.<br>-Greenhouses and Stables<strong>\u00a0<br>(<\/strong>Ankara Metropolitan Municipality) (Design and constr. supervision)<\/p>\n\n\n\n<p><a href=\"https:\/\/gen-tes.com.tr\/projeler_en\/KemerYatLimani\/KemerYatLimani.htm\"><strong>Antalya\/Kemer Marina\u00a0Facilities<\/strong><\/a><strong>,<\/strong>\u00a020.500 sq.m. (total)<br>(State Tourism Bank) <\/p>\n\n\n\n<p><strong>State Naval\u00a0Forces of Turkiye <\/strong>(Ministry of Defense)<br>&#8211; Izmir Foca Shooting Polygon, 3.000 sq.m.<\/p>\n\n\n\n<p><strong>Mugla\/Marmaris AMAZON Camping Facilities and Swimming pool\u00a0<br><\/strong>(Design + site supervision) <strong>(<\/strong>Private\u00a0client) <\/p>\n\n\n\n<p><strong>METU Graduates&#8217; Assoc. Ankara Recreational Facility<br>and Closed Swimming Pool<\/strong>\u00a0(Middle East Technical University) <\/p>\n\n\n\n<p><strong>Mugla\/Bodrum OZLEM Touristic Facilities <\/strong>(Private client)<strong><br>&#8211; <\/strong>Swimming Pool <strong><br>&#8211; <\/strong>Guest Rooms Building\u00a0\u00a0<br>&#8211; Restaurant\u00a0Building<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-18-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Design Consultancy Services<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-18-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p><strong><a href=\"https:\/\/gen-tes.com.tr\/en\/wp-content\/uploads\/2026\/02\/image-7.jpeg\" target=\"_blank\" rel=\"noreferrer noopener\">\u201cMERKEZ ANKARA\u201d Mix Use Complex<\/a> <\/strong>(Pasifik GYO)GEN-TES provided Mechanical Engineering\u00a0 Design Consultancy Services<br>(HVAC, Sanitary and Fire Fighting designs) during the Concept and Preliminary Design phases of the Complex.<br> <strong>Features:<br><\/strong>&#8211; Residential, office, retail, and other functions on a single large parcel of 125.000 sq.m. Total construction area: 1,185,015 sq.m.<br>&#8211; Residential components, with 1578 units divided into different types and blocks, each with variations in apartment sizes.<br>&#8211; Commercial\/Office towers with parking and open spaces. Pasific Tower (Flagship Skyscraper, 66 floors, 300 m. high), Collective Office Tower and Terrace Office Tower &#8211; serving as office complexes.<br>&#8211; Retail-Commercial Zone (a 600 m. long open-air shopping street\/retail avenue with about 150 shops in its retail corridor)<br>&#8211; Offices (total of varying between 1425-1500 offices)<br>&#8211; Residential and mix-use blocks\u00a0 (Residential Block: 38 floors)<br>&#8211; Smaller City Suites and Villas<br>&#8211; Various social facilities, landscaped open areas and plazas, shared courtyards, gardens and ponds.<br>(Construction of some buildings, such as apartment houses-villas, hotels and some shopping areas continue in the year 2025.)<\/p>\n\n\n\n<p><strong>Ankara GIMAT Dry Food Wholesalers&#8217; Compound<\/strong>, 360 shops<br>(Engineering Consultancy Services) \u00a0<\/p>\n\n<\/div>\n\t\t<\/div>\n\n<div class=\"wp-block-ub-content-toggle-accordion\" style=\"border-color: #c2a990; \" id=\"ub-content-toggle-panel-block-\">\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-title-wrap\" style=\"background-color: #c2a990;\" aria-controls=\"ub-content-toggle-panel-19-71a52fa8-7dbe-4306-9e88-b72e020882d7\" tabindex=\"0\">\n\t\t\t<h4 class=\"wp-block-ub-content-toggle-accordion-title ub-content-toggle-title-71a52fa8-7dbe-4306-9e88-b72e020882d7\" style=\"color: #000000; \"><strong>Selected Dispute Avoidance\/Adjudication, Construction Contract Consultancy and Claim Management<\/strong><\/h4>\n\t\t\t<div class=\"wp-block-ub-content-toggle-accordion-toggle-wrap right\" style=\"color: #000000;\"><span class=\"wp-block-ub-content-toggle-accordion-state-indicator wp-block-ub-chevron-down\"><\/span><\/div>\n\t\t<\/div>\n\t\t\t<div role=\"region\" aria-expanded=\"false\" class=\"wp-block-ub-content-toggle-accordion-content-wrap ub-hide\" id=\"ub-content-toggle-panel-19-71a52fa8-7dbe-4306-9e88-b72e020882d7\">\n\n<p>Managing Director of GEN-TES has substantial experience on Turkish legislation &amp; procedures about the procurement of Engineering Consultancy services and Professional Liability Insurance; got involved in numerous relevant voluntary services &amp; activities both in Turkiye and abroad related to those, including participation in the preparation of 7th, 8th, 9th and 11th Development Plans of Turkiye for Engineering Consultancy Services. She is also highly experienced in FIDIC Conditions of Contracts through her voluntary and non-stop involvement in FIDIC Committees starting from the year 1992 until present. FIDIC Conditions of Contracts (Red, Yellow and Silver Books i.e. Rainbow Suite &#8211; first edition 1999) are prepared and published during her membership in the FIDIC Board (Executive Committee) between the years 1996-2000.<br><br>In addition to Engineering Designs and Design Consultancy services, Managing Director renders Dispute Adjudication and Dispute Avoidance\/Adjudication services mostly for the construction works done through FIDIC Conditions of Contracts.\u00a0 Construction Contracts Consultancy and Claim Management services, provision of FIDIC Contracts seminars and training courses are also provided. She has rendered a total of five seminars of 2-days on behalf of ATCEA, two of them being in Ankara and three in Istanbul to date. She also attended the certified international seminar on FIDIC Conditions of Contracts, given by the FIDIC accredited trainer \u2018<em>Hill International\u2019<\/em>.<br>The selected Dispute Avoidance\/Adjudication, Contract Consultancy and Claim Management \u00a0Services rendered by Fatma Colasan on behalf of GEN-TES Ltd. are given below:<br><br><strong>\u201cCIVIL WORKS FOR THE CONSTRUCTION OF A BURN CENTER AND REORGANIZATION OF THE HOSPITAL\u2019S MEDICAL FLOW FOR A BETTER POSITIONING AND CONNECTION OF THE EAU, AICU AND SURGERY DEPARTMENTS FOR THE\u00a0 BUCHAREST TARGU MURES EMERGENCY COUNTY (CW\/A\/2) \u201d<br><\/strong>(Bucharest\/Romania, 2024-present; service continues)<br><br><strong>Client:<\/strong> Ministry of Health, Project Management Unit of the World Bank Funded Project (PMU) of the Government of Romania<br><strong>Contractor<\/strong>: Joint Venture Consisting of YDA Insaat Sanayi ve Ticaret A.S. (Turkiye)<br>and Synergy Construct SRL (Romania), represented by YDA A.S. being the JV Leader.<br><strong>Conditions of Contract: <\/strong>FIDIC<br><strong>Service to be rendered:<\/strong>\u00a0 Dispute Avoidance\/Adjudication (DAAB)<br><strong>DAAB member of three persons: <\/strong>Eng. Fatma Colasan(Turkiye)+ two other DAABmembers (Romania)<br><strong>Present situation:<\/strong> No disputes have arisen yet; DAAB members continue following the developments of the construction works.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u201c<strong>CONSTRUCTION WORKS OF YOZGAT DRINKING WATER and SEWERAGE NETWORKS\u201d <\/strong>(Turkiye, 2024-present)<br><br><strong>Client:<\/strong>\u00a0 Yozgat Municipality, Turkiye<br><strong>Contractor<\/strong>: Gurbetoglu Construction Co. Inc.<br><strong>Beneficiary<\/strong>: State Provincial Bank of Turkiye<br><strong>Conditions of Contract: <\/strong>State Provincial Bank\u2019s Construction Contract<br><strong>Service to be rendered:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma Colasan<br><strong>(Present situation: <\/strong>Four disputes between the Client and Consultant are reported to the Adjudicator. For various reasons, no conclusion has yet been reached regarding dispute resolution. Assignment continues.)<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u201c<strong>PREPARATION OF AN EXPERT REPORT REGARDING THE DISPUTES BETWEEN THE PARTIES ABOUT THE CONSTRUCTION WORKS OF ERZINCAN <\/strong><strong>1992 EARTHQUAKE REHABILITATION AND RECONSTRUCTION PROJECT\u201d <\/strong>(Turkiye, 2007)<br><strong><br>Client<\/strong><strong> <\/strong>(Defendant)<strong>:<\/strong> TOKI &#8211; State Mass Housing Administration General Directorate<strong><br>Contractor <\/strong>(Complainant): ERE Construction Co. Inc.\u00a0<br><strong>Constr. Contract: <\/strong>FIDIC Conditions of Contract (Red Book, 1999 edition)<br><strong>Expert: <\/strong>Eng.Fatma \u00c7\u00f6la\u015fan (FC)<br>A lawsuit regarding the disputes between the parties has been filed by the Contractor in the relevant Court of Ankara. Following the Court\u2019s appointment of FC as an expert witness and considering the disputes and previous experts\u2019 reports, a new report is prepared in accordance with the relevant FIDIC Conditions of Contract and submitted to the Court by FC.<br><\/li>\n\n\n\n<li>\u201c<strong>EVALUATION OF THE EXISTING PREVIOUS EXPERT REPORT REGARDING THE DISPUTES BETWEEN THE CLIENT AND THE CONTRACTOR ABOUT THE<\/strong> <strong>CONSTRUCTION WORKS OF \u2018TED ANKARA COLLEGE FOUNDATION CAMPUS BUILDINGS\u2019 IN TERMS of FIDIC CONDITIONS OF CONTRACT AND PREPARATION OF AN OPINION FOR ATCEA\u201d<\/strong> (Association of Turkish Consulting Engineers and Architects, Turkiye. (2012)<br><strong><br>Client <\/strong>(Complainant)<strong>:<\/strong> TED Ankara College Foundation<br><strong>Contractor <\/strong>(Defendant):\u00a0 Kocoglu Construction Co. Inc.<br><strong>Construction Contract:<\/strong> FIDIC Cond. of Contract (Yellow Book, 1999 edition)<br><strong>Expert:<\/strong> Eng. Fatma Colasan (on behalf of ATCEA)<br>The subject report is prepared by FC and submitted to the relevant court by ATCEA requesting to be evaluated. (The court, after evaluating the Expert\u2019s opinion, ruled in favor of the Client in line with the Expert\u2019s opinion.)<br><\/li>\n\n\n\n<li><strong>\u201cCONSTRUCTION OF ISTANBUL UMRANIYE HOSPITAL, CLAIM MANAGEMENT<br>&amp; CONTRACT CONSULTANCY SERVICES\u201d \u00a0<\/strong>(Turkiye, 2013-2015)<br><br><strong>Client:<\/strong> Ministry of Health, Turkiye<br><strong>Contractor:<\/strong> YDA Group of Companies (ARDEM Co. Inc.)<br><strong>Conditions of Contract:\u00a0 <\/strong>FIDIC Red Book (1999 edition)<br><strong>Consultant:<\/strong> Eng. Fatma Colasan (FC)<br><strong>Rendered service:<\/strong> Claim Management and Contract Consultancy<br>Throughout the construction period, the Contractor is informed and advised in accordance with the relevant FIDIC Conditions of Contract, in particular \u00a0to prevent disputes between the parties. Contractor\u2019s correspondences are monitored by the Consultant and suggestions were made to ensure that claims were prepared in accordance with the Conditions of Contract. No dispute arose between the parties during the construction period. )<br><\/li>\n\n\n\n<li> \u201c<strong>DISPUTE ADJUDICATION SERVICES OF<\/strong> <strong>CONSTRUCTION OF BUSINESS INCUBATOR BUILDINGS IN CITIES OF KASTAMONU and TOKAT\u201d<\/strong> (Turkiye, 2013-2015)<br><br><strong>Client:<\/strong> Ministry of Science, Industry and Technology \u2013 DG for EU and Foreign Affairs \u2013 Regional Competitiveness Program Coordination and Implementation Directorate (MoSIT\/RCP-CID) Department of EU Investments, Ministry of Environment and Urbanization of Turkiye<br><strong>Contractor:<\/strong> BOR-TOR Construction Co. Ltd.<br><strong>Conditions of Contract:<\/strong> FIDIC Red Book (1999 \u00a0edition)<br><strong>Rendered services:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma \u00c7\u00f6la\u015fan <br>(Four disputes between the Client and the Contractor are resolved.)\u00a0<br><\/li>\n\n\n\n<li><strong>\u201cDISPUTE ADJUDICATION SERVICES OF<\/strong> <strong>CONSTRUCTION OF TECHNOLOGY DEVELOPMENT ZONES IN GAZIANTEP, KAYSERI AND ELAZIG, LOT-2: CONSTRUCTION FOR THE ERCIYES TECHNOLOGY DEVELOPMENT\u201d <\/strong>(Turkiye,2014-2015)<br><br><strong>Client:<\/strong> Ministry of Science, Industry and Technology \u2013 DG for EU and Foreign Affairs \u2013 Regional Competitiveness Program Coordination &amp; Implementation Directorate \u00a0of Turkiye<br><strong>Contractor:<\/strong> GINTAS Construction Co. Inc.<br><strong>Conditions of Contract:<\/strong> FIDIC Red Book (1999 edition)<br><strong>Rendered service:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma \u00c7\u00f6la\u015fan<br>(Six disputes between the Client and the Contractor are resolved.)<\/li>\n<\/ul>\n\n\n\n<p>\u27a2 \u201c<strong>DISPUTE ADJUDICATION SERVICES OF<\/strong> <strong>S<\/strong><strong>IVEREK WASTE WATER TREATMENT PLANT CONSTRUCTION\u201d <\/strong>(Turkiye, 2015-2016)<br><br><strong>Client:<\/strong> Ministry of Environment and Urbanization, Department of EU Investments, Turkiye<br><strong>End Recipient<\/strong> (User ):\u00a0 Sanliurfa Municipality, General Directorate of SUSKI<br><strong>Contractor:<\/strong> VA TECH WABAG GmbH<br><strong>Conditions of Contract:<\/strong> FIDIC Yellow Book (1999 edition)<br><strong>Rendered service:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma \u00c7\u00f6la\u015fan<br>(Four disputes between the Client and Contractor are resolved.)<\/p>\n\n\n\n<p>\u27a2 \u00a0\u201c<strong>CONSTRUCTION WORKS OF SIIRT PISTACHIO PROCESSING FACILITY\u201d<\/strong><br>(Turkiye, 2017-2018)<br><br><strong>Client:<\/strong> Regional Competitiveness Program Coordination and Implementation Directorate, Finance and Contract Department of MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY, Turkiye \u00a0<br><strong>Engineer:<\/strong> SWECO<br><strong>End Recipient <\/strong>(User ): Union of Pistachio Producers in the Province &amp; Districts of Siirt<br><strong>Contractor:<\/strong> TIGRIS Engineering Consultancy Electrical Electronics Construction Industry Trade Ltd.Co. &amp; SAY Joint Venture<br><strong>Conditions of Contract:<\/strong> FIDIC Yellow Book (1999 edition)<br><strong>Rendered service:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma \u00c7\u00f6la\u015fan<br>(Four disputes between the Client and Contractor are resolved.)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u201c<strong>CONSTRUCTION WORKS OF BARTIN \u00a0WASTE WATER TREATMENT PLANT\u201d<br><\/strong>(Turkiye, 2019-2020)<br><strong>Client:<\/strong> Department of EU Investments, Ministry of Environment and Urbanization, Turkiye<br><strong>End Recipient<\/strong> (User ):\u00a0 Bartin Municipality<br><strong>Contractor:<\/strong> GEZER Constr. Co. Inc.<br><strong>Conditions of Contract:<\/strong> FIDIC Yellow Book (1999 edition)<br><strong>Rendered service:<\/strong> Dispute Adjudication (DAB)<br><strong>Dispute Adjudicator of One Sole Member:<\/strong> Eng. Fatma \u00c7\u00f6la\u015fan<br>(Five disputes between the Client and Contractor are resolved.)<\/li>\n<\/ul>\n\n\n\n<p><strong><br>FIDIC:<\/strong> International Federation of Consulting Engineers (Located in Geneva\/Switzerland)<br><strong>EFCA:<\/strong> European Federation of Consulting Engineering Associations (Located in Brussels\/Belgium)<br><strong>ATCEA:<\/strong> Association of Turkish Consulting Engineers &amp; Architects<\/p>\n\n<\/div>\n\t\t<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-73","page","type-page","status-publish","hentry"],"featured_image_src":null,"_links":{"self":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/pages\/73","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/comments?post=73"}],"version-history":[{"count":32,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/pages\/73\/revisions"}],"predecessor-version":[{"id":220,"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/pages\/73\/revisions\/220"}],"wp:attachment":[{"href":"https:\/\/gen-tes.com.tr\/en\/wp-json\/wp\/v2\/media?parent=73"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}